BORDER STREET IMPROVEMENT ECONOMIC DEVELOPMENT CORPORATION.
IT'S TUESDAY, FEBRUARY 6TH, 2024.
UH, I'D LIKE TO WELCOME, UH, OUR NEW MEMBERS TO THE BOARD.
I HAVE DIRECTOR, UH, MIKE INGRAM.
WELCOME, WELCOME BOARD AND COUNCIL MEMBER DAWKINS.
THANK YOU GUYS FOR JOINING US THIS EVENING.
UM, FIRST ORDER OF BUSINESS IS APPROVAL OF THE AUGUST 15TH, 2023.
I HAVE A MOTION TO APPROVE BY, UM, CAST MEMBER FARCO.
I HAVE A SECOND, UH, BY DIRECTOR SCHULTZ.
UH, ALL IN FAVOR, UH, SAY AYE.
THAT MO
SO NOW THAT WE'VE APPROVED THE MINUTES, WE'LL GO AHEAD AND GO ON TO, UH, NEW BUSINESS.
WE HAVE A STAFF REPORT ON THE STATUS OF FISCAL YEAR 20 23, 20 24 STREET IMPROVEMENT ECONOMIC DEVELOPMENT CORPORATION PROJECTS TO GIVE YOU PUBLIC WORKS DIRECTOR CHERYL TAYLOR.
HOW ARE YOU DOING THIS EVENING? DOING GOOD ALL.
SO THIS IS A CURRENT ACTIVE PROJECTS MAPPED.
UM, I I THINK YOU ALL SHOULD HAVE A, UM, A HARD COPY OF THIS THAT WE PASSED OUT.
UM, AS YOU CAN SEE, WE HAVE A LOT OF PROJECTS THAT ARE GOING ON IN BEDFORD RIGHT NOW.
THIS OVERALL MAP SHOWS WATER, SANITARY SEWER, PRIVATE DEVELOPMENT, AND STREET PROJECTS THAT ARE EITHER UNDER CONSTRUCTION OR CURRENTLY UNDER DESIGN AND WILL BE GOING OUT FOR CONSTRUCTION IN THE NEXT YEAR.
I JUST, I LIKE TO SHOW THIS EVERY TIME I CAN BECAUSE THERE, THERE REALLY IS A LOT GOING ON HERE.
THIS ITEM ON YOUR AGENDA IS A STATUS UPDATE OF THE FY 2324 CIP PROJECTS THAT WERE APPROVED IN THE BUDGET AT YOUR LAST MEETING IN AUGUST.
MUCH OF TONIGHT'S PRESENTATION WILL BE A REFRESHER OF THE ITEMS WORKED THROUGH THE PREVIOUS BOARD B BOARD MEETING FOR THE NEW FACES ON THE COMMISSION.
ONCE WE COMPLETE THE STATUS OF THOSE PROJECTS, WE'LL PROVIDE A QUICK SUMMARY OF HOW WE GOT TO WHERE WE ARE TODAY AND IS, UM, ALSO SOME FUTURE PLANS FOR THE STREET SYSTEM.
THIS MAP SHOWS THE LOCAL STREETS AND THE THOROUGHFARES THAT WERE APPROVED FOR THE CURRENT FISCAL YEAR.
SO STARTING WITH THE THOROUGHFARES CITYWIDE TRAFFIC SIGNAL UPGRADE, CUMMINGS DRIVE AND WADE IN 2020, THE MARIN CITY COUNCIL'S PRIORITIES INCLUDED IMPROVEMENTS TO THE CITY'S THOROUGH AFFAIRS.
SINCE THAT TIME, HARWOOD ROAD, FOREST RICH DRIVE, BEDFORD ROAD, MCLEAN AND SAC HAVE BEEN IMPROVED AS WELL AS A FULL UPGRADE OF THE TRAFFIC SIGNAL AT THE INTERSECTION OF HARWOOD AND CENTRAL.
WHILE A SIGNIFICANT AMOUNT OF EFFORT HAS BEEN APPLIED TO THOROUGHFARE PREVIOUSLY, THERE ARE OTHERS THAT REQUIRE WORK.
CUMMINGS DRIVE AND WADE WERE APPROVED FOR THE CURRENT FISCAL YEAR TRAFFIC SIGNAL AND THE, THE FINAL TRAFFIC SIGNAL IN THE CITYWIDE UPGRADE PROJECT WILL BE COMPLETED THIS YEAR AT THE INTERSECTION OF CUMMINGS AND CENTRAL AND MAY ALSO INCLUDE A RELOCATION OF THE SIGNAL CABINET AT THAT INTERSECTION.
THE FISCAL YEAR 2324 THOROUGHFARE PROJECTS ARE HIGHLIGHTED ON THE SLIDE SPREADSHEET WAS INCLUDED IN YOUR PACKETS AND THE TABLE LISTS THE THOROUGHFARES THAT ARE FUNDED WITH THE 2021 THOROUGHFARE BOND.
WITH THE COMPLETION OF THESE PROJECTS, THE REMAINING BALANCE OF THE 2021 BOND WILL BE JUST OVER $700,000 UTILIZING AN INTERLOCAL AGREEMENT WITH THE CITY OF GRAND PRAIRIE, THE CITY IS CONTRACTED WITH REYNOLDS ASPHALT TO PAVE CUMMINGS DRIVE FROM CENTRAL ALL THE WAY UP TO ASHFORD DRIVE, WHERE THE CONCRETE ENDS UP TOWARDS STATE HIGHWAY 1 21 TO LESSEN THE POTENTIAL IMPACTS ON TRAFFIC FLOWS IN THE VICINITY OF SPRING GARDEN ELEMENTARY MILLING AND PAVING IS SCHEDULED FOR THE SUMMER WHEN SCHOOLS NO LONGER IN SESSION PAVEMENT STRIPING WILL BE SCHEDULED TO REPLACE ALL OF THE EXISTING MARKINGS APPROXIMATELY TWO WEEKS AFTER PAVING OPERATIONS ARE COMPLETE.
AGAIN, THIS PROJECT IS BEING FUNDED THROUGH THE 2021 THOROUGHFARE BOND.
THESE ARE THE BEFORE PHOTOS OF CUMMINGS DRIVE, PRIOR MILL PRIOR TO MILLEN OVERLAY.
A SIGNIFICANT AMOUNT OF CONCRETE WORK HAS BEEN COMPLETED ALREADY IN COORDINATION WITH OUR COMMUNICATIONS DEPARTMENT.
THESE ARE PHOTOS FROM THE DRONE FOOTAGE THAT THEY TOOK OF CUMMINGS FROM ONE END OF THE PROJECT TO THE OTHER.
HERE WE CAN SEE CONCRETE REPAIRS AT VARIOUS LOCATIONS AS WELL AS NEW CURB GUTTER AND VALLEY GUTTERS ALONG THE CORRIDOR.
PUBLIC WORKS WILL FILM A VIDEO OF THE PROJECT WHICH WE POSTED TO ALL OF THE CITY'S SOCIAL MEDIA CHANNELS IN THE CITY'S WEBSITE.
WADE DRIVE FROM PIPELINE ROAD TO HIRSCH DRIVE WILL BE REPAVED IN PARTNERSHIP WITH TARRANT COUNTY PRECINCT THREE EVERY YEAR.
THE CITY PARTNERS WITH TARRANT COUNTY.
THE CITY PROVIDES TRAFFIC CONTROL, COORDINATES THE MILLING OPERATION AND PURCHASES ASPHALT FOR THE PROJECT, AND THE COUNTY PROVIDES EQUIPMENT AND LABOR.
WADE IS SCHEDULED FOR, UH, IMPROVEMENTS AROUND THE WEEK OF MARCH 4TH.
SO THE INTER, EXCUSE ME, THE INTERLOCAL WITH TARRANT COUNTY WILL BE ON A FUTURE COUNCIL AGENDA.
CAN WE DO THAT ALREADY? THAT ONE'S COMING FORWARD.
NO, WE DID, WE APPROVED THAT ONE ALREADY AT THE LAST MEETING.
THAT ONE WAS APPROVED, SO THEY'VE GOTTA TAKE IT TO COMMISSIONER'S COURT SO THAT WE CAN START THE PROJECT IN MARCH.
[00:05:03]
SO WADE DRIVE IS A MAJOR COLLECTOR FROM AVAILABLE RECORDS.THE PAVEMENT WAS RESURFACED AROUND 2010.
DOES ANYBODY HAVE ANY QUESTIONS ON THOROUGHFARES? OKAY.
MOVING ON TO THE FISCAL 2324 LOCAL STREETS.
THIS SPREADSHEET WAS ALSO INCLUDED IN YOUR, IN YOUR HARD COPIES AND IN YOUR PACKETS.
LOCAL STREET ARE FUNDED WITH THE FOUR B OPERATING BUDGET.
THE LIST INCLUDES CONSTRUCTION OF PHYLLIS STREET, WHICH WAS AWARDED APPROXIMATELY $160,000 FROM, FROM TARRANT COUNTY THROUGH A GRANT, UH, GRANT PROGRAM.
THE ENGINEERING DESIGN FOR THAT PROJECT IS COMPLETE CONSTRUCTION CONTRACT IS ANTICIPATED TO COME BEFORE COUNCIL FOR APPROVAL THIS SPRING WITH CONSTRUCTION TENTATIVELY SCHEDULED FOR THE SUMMER, TOTAL ESTIMATED COST, INCLUDING WATER AND SEWERS, ABOUT $1.6 MILLION.
THE GREGORY AND BEDFORD COURT EDITION PROJECT INCLUDES PAVING OF THE STREETS AS WELL AS SANITARY SEWER IMPROVEMENTS TO REPLACE THE AGING PIPE.
DESIGN IS PROGRESSING AND THE PROJECT WILL BE ADVERTISED FOR BID IN THE SPRING OR SUMMER.
THE REMAINING 20 PLUS STREETS WERE CHOSEN USING A COMBINATION OF PAVING DATA COLLECTED BY IMS IN 2022.
UM, ALSO EXISTING PAVING WATER, SEWER AND DRAINAGE PROJECTS IN THE AREA.
AND, UM, THEY'RE ALSO CHOSEN BASED ON FUNDING AVAILABILITY.
LOOKS LIKE THE TOTAL OF ALL OF THE PROJECTS LOCAL STREETS FOR THE YEAR IS APPROXIMATELY $5 MILLION.
HERE'S A CITYWIDE MAP SHOWING THOSE 2324 LOCAL STREETS.
THEY ARE KIND OF SPRINKLED THROUGHOUT THE CITY.
THE MAP IS ALSO INCLUDED, UM, IN YOUR PACKETS.
SO THESE ARE THE INDIVIDUAL NEIGHBORHOODS.
THE BLUE LINES INDICATE MILL AND OVERLAYS, AND THE PINK LINES ARE FULL RECONSTRUCTION.
AS I MENTIONED, PHYLLIS AND GREGORY ADDITIONS ARE PLANNED FOR CONSTRUCTION IN THE SUMMER AND SPRING.
AND THEN THE REMAINING STREETS ARE EITHER COMPLETE OR WILL BE COMPLETED THIS MONTH.
SO BE, LET'S SEE, CENTURY PLACE EDITION, THE BOTTOM CENTER, UH, THOSE, THAT NEIGHBORHOOD WAS COMPLETED PRIOR TO THE END OF THE CALENDAR YEAR.
THE CONTRACTOR THEN MOVED OVER TO SHADY BROOK AND SHADY, UH, SHADY GROVE, AND THEY'VE COMPLETED THE PAVING THERE AS WELL.
AND THEN TOP RIGHT IS NOTTINGHAM ADDITION.
THAT ONE WAS COMPLETED PROBABLY IN THE LAST WEEK OR SO, AND THEY ARE CURRENTLY WORKING IN THE TOP MIDDLE, UM, NEIGHBORHOOD CUMMINGS DRIVE.
I BELIEVE THEY'VE COMPLETED THE PAVING OF THE TWO.
UM, TURNER, WHAT IS, THEY CALL IT, TURNOUTS.
AND THEY WILL BE PAVING CUMMINGS AND MICHAEL SEAN.
I BELIEVE THEY SHOULD BE COMPLETED WITH THAT PAVING SOMETIME THIS WEEK.
THEN THEY WILL MOVE OVER TO HARWOOD TERRACE, WHICH IS, UH, TOP LEFT.
AND THEY SHOULD BE COMPLETED WITH, I BELIEVE ALL OF THOSE STREETS, UM, PROBABLY IN THE NEXT COUPLE WEEKS.
SO THE REMAINING ONES ARE GONNA BE THE TWO THAT, THAT ARE GOING OUT FOR BID THAT ARE GREGORY EDITION.
AND PHYLLIS, ARE THERE ANY QUESTIONS ON LOCAL STREETS? YES, MA'AM.
SO FOR THE GREGORY AND BEDFORD COURT EDITIONS, WHAT IS FULL DEPTH RECLAMATION? WHAT KIND OF WORK IS THAT? SO, FULL DEPTH MEANS THAT THEY'RE GONNA HAVE TO REPLACE ALL OF THE PAVEMENT.
THEY'RE GONNA REPLACE ALL OF THE STABILIZATION.
AND BECAUSE IT'S A FULL RECONSTRUCTION PROJECT, UM, WE GENERALLY CALL OUT THOSE OUT FOR FULL RECONSTRUCTION WHEN THE CURBS AND THE GUTTERS ARE A LITTLE WAVY AND IT'S TOO MUCH TO JUST DO SMALL SECTIONS.
SO THEY'RE GONNA REPLACE ALL OF THE CURBS, ALL OF THE GUTTERS, UM, AND ALL OF THE PAVEMENT.
AND AS WE WERE PUTTING THAT, THE SCOPE OF THAT PROJECT TOGETHER, WE ALSO NOTICED THAT THERE WERE SEVERAL WORK ORDERS IN THAT AREA FOR SANITARY SEWER BACKUPS.
SO, UH, SANITARY SEWER REPLACEMENT IN PARTS OF THAT NEIGHBORHOOD ARE GONNA BE INCLUDED IN THAT PROJECT.
SO HERE ARE SOME AFTER PHOTOS OF THAT CENTURY PLACE EDITION.
THESE ARE THE ONES THAT WERE COMPLETED BEFORE THE END OF THE CALENDAR YEAR, SHADY BROOK AND SHADY GROVE.
THESE ARE THE BEFORE PICTURES, AND THESE ARE THE AFTER PICTURES.
THESE ARE THE BEFORE PICTURES.
AND THESE ARE THE PICTURES, I BELIEVE JUST FROM LAST WEEK WHERE THEY COMPLETED THAT PAVING AS WELL.
SO THIS IS MICHAEL, SEAN CUMMINGS, CUMMINGS COURTS, HARWOOD TERRACE, AND DEVON COURT.
THAT'S THE NEIGHBORHOOD, THE AREA THAT THEY'RE WORKING IN RIGHT NOW.
AND WE SHOULD HAVE THE AFTER PICTURES, UM, AT YOUR NEXT BOARD MEETING.
THOSE ARE NOT, NO, THOSE ARE NOT FULL RECONSTRUCTION.
THEY'RE, THEY'RE EITHER MILL AND OVERLAY OR, UM, JUST RECONSTRUCTION OF THE, OF THE PAVEMENT IN THOSE AREAS THOUGH, BEFORE WE GO.
AND THEY, AND WE, UM, PAVED THOSE STREETS.
THE STREET DEPARTMENT DOES GO OUT THERE AND THEY CHECK SECTIONS OF CURB AND SECTIONS OF GUTTER THAT MAY NEED TO
[00:10:01]
BE REPLACED.AND ALL THAT WORK IS COMPLETED BEFORE THE CONTRACTOR COMES OUT TO, TO DO THE PAVING.
IT'S JUST NOT FULL, UM, REPLACEMENT OF THE CURB AND GUTTER THROUGH THE NEIGHBORHOOD.
IT'S SOMETHING THAT'S A LITTLE BIT MORE MANAGEABLE BY STAFF, STAFF OR CONTRACTORS.
SO THESE ARE LOCAL STREETS THAT ARE SELECTED FOR PREVENTIVE MAINTENANCE.
GIVEN THE GOOD FEEDBACK WE CONTINUE TO RECEIVE, STAFF WILL CONTINUE TO USE THE HIGH DENSITY MINERAL BOND AS A PRIMARY PREVENTIVE MAINTENANCE TECHNIQUE IN ADDITION TO CRACKED CEILING.
WE CONTINUE TO USE AN INTERLOCAL AGREEMENT WITH HEARST FOR THAT HIGH DENSITY MINERAL BOND.
WE KIND OF TRIED TO BLOW UP THOSE NEIGHBORHOODS OR ZOOM IN A LITTLE BIT SO YOU CAN SEE, UM, HOW MANY STREETS ARE GONNA BE DONE THIS YEAR.
AND DALE CONSTRUCTION IS AN APPROVED APPLICATOR OF THE HA FIVE HIGH DENSITY MINERAL BOND PRODUCT.
THEY PROVIDE A WEBSITE AND A PAGE DEDICATED SPECIFICALLY TO THE CITY OF BEDFORD.
AND THE WEBSITE IS GENERALLY THE SAME, THE HA FIVE INFO.COM/BEDFORD, THEY DO HAVE AN EXTENSIVE COMMUNICATION PLAN.
THEY PUT OUT TEXT BOARDS OUT THERE SO THAT, UM, WHEN RESIDENTS GO BY, THEY CAN SIGN UP FOR THE TEXT ALERTS.
I BELIEVE THIS IS PLANNED FOR USUALLY IN THE SUMMER, SUMMER MONTHS.
UH, THEY ALSO HAVE A LIVE CHAT ON THEIR WEBSITE.
SO IF ANY OF THE RESIDENTS WANNA COME GET IN THERE AND SAY, HEY, I LIVE AT THIS ADDRESS, YOU KNOW, ARE YOU GONNA BE DOING MY STREET TODAY? THEN THEY'LL BE ABLE TO, TO GET A LIVE PERSON TO ANSWER THOSE QUESTIONS.
SO WE'VE GOTTEN SOME PRETTY GOOD FEEDBACK ON HOW DOES THAT WORK? BECAUSE PEOPLE CAN'T DRIVE ON IT FOR 24 HOURS, IS THAT? WELL, UM, WHAT THEY DO IS THEY PUT THESE MAPS, SO THE MAPS ON THE RIGHT, THEY SHOW THESE ARE THE MAPS FROM LAST YEAR, BUT THEY USUALLY DO ONE, THEY'LL DO THE, THESE FOUR, ALL OF THOSE NEIGHBORHOODS AND THEY COLOR CODE THEM.
SO ON THE FIRST DAY, SAY BLUE, THEY'LL DO ON MONDAY, YELLOW, THEY'LL DO ON THE NEXT DAY, AND THEY TRY TO MOVE IT, THEY TRY TO PLAN IT SO THAT IF THIS STREET'S BEING DONE, THE NEXT STREET ISN'T BEING DONE, THEN PEOPLE CAN PARK ON THE STREET OVER THERE.
SO WE WERE A, A LITTLE HESITANT WHEN THEY, WHEN THEY INITIALLY, UM, CAME IN AND THEY SHOWED US WHAT THEIR PLAN WAS.
AND CHERYL, HOW LONG HAVE WE BEEN DOING THIS HIGH DENSITY MINERAL BOND? THIS IS THE THIRD.
THIS YEAR WILL BE THE THIRD YEAR THAT WE'VE DONE IT.
AND HAVE WE HAD ANY, UM, ANY ISSUES WITH IT? UH, THE CONTACT WITH THE RESIDENTS, ANY, ANY ISSUES AT ALL BY, UM, OR COMPLAINTS BY THE RESIDENTS I SHOULD SAY.
I MEAN, OBVIOUSLY THEY HAVE TO PARK THEIR VEHICLE, I MEAN, SOMEWHERE ELSE.
BUT I MEAN, OTHER THAN THAT, THE INCONVENIENCE FACTOR, UH, ANYTHING WITH NOT KNOWING COMMUNICATIONS? NOT, NOT COMMUNICATIONS.
I, I DON'T BELIEVE WE'VE HAD MUCH, I DON'T BELIEVE THAT WE'VE HAD LIKE, SERIOUS ISSUES WITH, WITH THAT.
ONE OF THE COMPLAINTS THAT WE DO GET IS THAT RIGHT AFTER IT HAS BEEN PUT DOWN A TRASH TRUCK OR SOMEONE WILL COME IN THERE AND IT DOESN'T LOOK AS PRETTY YEAH.
WELL AS IT, YOU KNOW, THE LONGER IT SITS AND CURES THE, THE MORE IT BECOMES A LITTLE BIT HARDER AND IT DOESN'T, AND IT DOESN'T DO THAT MUCH.
AND THERE WAS ONE LOCATION WHERE THEY COMPLAINED AND IT LOOKED REALLY BAD AND THE CONTRACTOR ACTUALLY CAME OUT AND THEY SAID, WE'LL, WE'LL COME BACK AND WE'LL FIX IT.
SO THEY TOOK OUT A PIECE AND THEY, AND THEY REDID IT.
SO THEY'VE BEEN PRETTY RESPONSIVE TO US.
SO ABOUT REDOING IT, IF ANYTHING LIKE THAT WERE TO HAPPEN.
AND SO, SO IN THAT CASE, WE ACTUALLY HAD A, WAS IT A REPUBLIC TRUCK THAT CAME DOWN AND, AND I CAN'T SAY WHO IT WAS, THEY A GARBAGE.
THEY'VE SAID THAT IT'S A TRASH TRUCK.
THANK YOU FOR BEING POLITICALLY CORRECT, CHERYL.
HAVE WE GONE BACK AND LOOKED AT THE ONES WE DID TWO YEARS AGO AND SEE HOW THOSE STREETS ARE, ARE HOLDING UP? THEY'RE DOING PRETTY WELL.
WE HAVE, AND THEY, THEY ACTUALLY LOOK REALLY, REALLY GOOD.
AND THAT'S THE, I MEAN, AND GOING BACK, THAT'S THE WHOLE POINT, RIGHT? THIS IS EXTENDING THE LIFE OF THE STREETS AND OBVIOUSLY MAKING IT LOOK A LOT BETTER
UM, THE THINGS THAT, THE THINGS THAT DESTROY YOUR ASPHALT STREETS ARE THE SUNLIGHT AND PRECIPITATION.
SO IF YOU PUT A SEAL OVER IT, THEN IT REDUCES THE AMOUNT OF SUNLIGHT THAT'S ABLE TO DEGRADE IT AND OR THE, UM, AMOUNT OF, UM, PRECIPITATION THAT'S ABLE TO GET IN THERE, MOISTURE THAT GETS IN THERE, THAT, THAT WILL DESTROY THE, THE PAVEMENT AS WELL.
SO IT'S A, IT'S A PRESERVATION TECHNIQUE AND IT'S SOMETHING THAT WE ARE ABLE TO DO TO KEEP THE STREETS IN PRETTY GOOD CONDITION.
YEAH, I THINK IT'S ABOUT FIVE YEARS.
THE, UM, THE WARRANTY ON IT IS
[00:15:01]
FIVE, FIVE YEARS.I THINK THE WARRANTY ON IT WAS ABOUT FIVE YEARS.
SO THE, THE THOUGHT IS THAT IT WOULD ADD PRO MAYBE FIVE YEARS TO EACH OF THESE STREETS.
AND THE, THE THOUGHT BEHIND THE PREVENTIVE MAINTENANCE IS THAT YOU ARE PRESERVING GOOD STREETS, SO YOU'RE NOT GONNA PUT IT ON A STREET THAT'S GOT CRACKS AND AWFUL, AND IT'S GOT BUMPS AND IT LOOKS REALLY, REALLY BAD BECAUSE THOSE ARE THE STREETS.
YOU EITHER, THEY'RE EITHER IN BAD ENOUGH SHAPE, YOU LET THEM CONTINUE TO DEGRADE, AND THEN YOU REPLACE THEM LATER.
OR, YOU KNOW, YOU CAN DO PATCHES ON 'EM.
BUT IF YOU'VE GOT A STREET THAT LOOKS REALLY GOOD AND IT RUNS REALLY WELL, I MEAN, IT, IT RIDES WELL AND THE STRUCTURE LOOKS REALLY GOOD.
IF WE CAN MAKE THIS LAST A LITTLE BIT LONGER, I MEAN, IF WE HAD UNLIMITED FUNDS, WE CAN, YOU KNOW, THAT IT'S JUST NOT REASONABLE FOR US TO, TO EXPECT TO BE ABLE TO DO ALL THE STREETS ALL THE TIME.
BUT IF YOU PICK THE GOOD STREETS AND YOU DO WHAT YOU CAN TO PRESERVE IT, THEN IT KINDA LETS THE MONEY SPREAD OUT.
YOU'RE ABLE TO USE THAT MONEY FOR, FOR OTHER THINGS.
DOES THAT MAKE SENSE? AND THE, THE SAVING THE TAXPAYER MORE MONEY BECAUSE OF THAT? YES.
OKAY, SO MOVING ON TO OTHER STREET PROJECTS.
UM, TARRANT COUNTY TRANSPORTATION BOND, THE CITY OF BEDFORD, UH, APPLIED FOR THE TARRANT COUNTY TRANSPORTATION BOND FOR BROWN TRAIL FROM HARWOOD TO STATE HIGHWAY 180 3 AND ALL THE, OH, IT'S SUPPOSED TO BE HARWOOD DOWN TO PIPELINE ROAD.
UM, IT WAS A PARTNERSHIP WITH THE CITY OF HEARST, AND THAT PROJECT WAS GOING TO, IS IS GOING TO INCLUDE MEDIANS, AND IT IS CURRENTLY PENDING.
SO THIS PROJECT HAS NOT BEEN BUDGETED YET BY THE CITY OF BEDFORD.
HEARST HAS EXECUTED AN ILA WITH TARRANT COUNTY FOR DESIGN OF THEIR SECTION OF BROWN TRAIL.
AND WE SHOULD HAVE MORE INFORMATION ON THAT PROJECT FOR YOU ALL HOPEFULLY AT THE NEXT BOARD MEETING.
CHEEKS, BARGER ROAD WIDENING FROM BEDFORD ROAD TO HERITAGE IS WITHIN THE CITY LIMITS OF COLLEYVILLE.
CITY OF COLLEYVILLE APPLIED FOR THAT, UH, TRANSPORTATION BOND AND WE'RE AWARDED FUNDS FOR THAT.
WE ANTICIPATE CONCEPTUAL DESIGN BEGINNING MAYBE AS EARLY AS THIS FISCAL YEAR.
UH, TRA HAS APPROACHED, UH, THE CITIES OF BEDFORD AND COLLEYVILLE ABOUT EX EXPEDITING THE DESIGN TO INCLUDE REPLACEMENT OF THEIR LARGE DIAMETER TRANSMISSION, MAINE.
SO THAT'S ANOTHER PROJECT THAT WE'RE, WE'RE KIND OF HOLDING OFF AND WAITING FOR THE OTHER ENTITIES TO GET BACK WITH US BECAUSE THERE'S, WE DON'T CURRENTLY HAVE FUNDING FOR THAT PROJECT, EITHER STATE HIGHWAY 1 21 AND CHEEKS, BARGER.
A PRE-CONSTRUCTION MEETING WAS HELD BY TXDOT BEFORE THE HOLIDAYS.
MESSAGE MESSAGE BOARDS HAVE BEEN PLACED ALONG THE FRONTAGE ROADS AND CONSTRUCTION BEGAN, I BELIEVE LAST WEEK.
PROJECT IS ANTICIPATED TO BE COMPLETE LATE SUMMER AND EARLY FALL.
SO AT THE INTERSECTION OF CHEEKS, BARGER AND 1 21, THEY ARE, UM, ADDING SOME LENGTH TO THE LEFT TURN LANES.
THEY'RE ALSO UPGRADING THE SIDEWALKS AND RAMPS TO MAKE IT MORE A DA ACCESSIBLE.
AND THERE'LL BE SOME ADJUSTMENTS TO THE, TO THE TRAFFIC SIGNAL AND THE SIGNAL TIMING AT THAT INTERSECTION AS WELL.
ANY QUESTIONS ON THE OTHER PROJECTS? AND JUST FOR REFERENCE, THE, UH, CHEEKS, BARGER ROAD, UM, THE WHOLE ROAD IS OWNED BY COLLEYVILLE AND THEY'RE THE ONES WHO GOT THE TARRAN THE FUNDS FROM TARRANT COUNTY, CORRECT? THAT'S CORRECT.
SO BASICALLY THE BALL'S IN THEIR COURT, WE'RE JUST WAITING.
UM, AND HOPEFULLY, YOU KNOW, WE WANNA SEE THE, I MEAN, IS IT TRUE THAT WE WANT TO SEE WHERE WE CAN PARTNER WITH THEM FOR SOME OF THE INTERSECTIONS? UM, BUT NOT A MAJORITY OF IT, BECAUSE AGAIN, THE ROAD BELONGS TO COLLEYVILLE, SO IT'S THEIR RESPONSIBILITY.
THE ROAD BE BELONGS TO COLLEYVILLE.
BOTH SIDES OF THE ROAD, BECAUSE I THOUGHT ONE SIDE WOULD BAD.
MM-HMM, NO, THE WHOLE, THE GREEN THE GREEN SPACE, YEAH.
THE, THE, THE WALKING TRAIL AND THE GREEN SPACES IS OURS, CORRECT? THE PAVEMENT.
AND THEN EVERYTHING TO THE NORTH OF THE PAVEMENT BELONGS TO THEM.
YEAH, YOU'RE SPEEDING ON COLLEYVILLE.
THE PAVEMENT BELONGS TO COLLEYVILLE
TO RECAP, FOR OUR NEW BOARD MEMBERS, UM, THIS IS A STRATEGIC PLAN FOR STREETS.
UM, THE STRATEGIC PLAN, WHAT WE, WHAT WE SAID A COUPLE OF YEARS AGO WAS THAT WE WERE GONNA COME UP WITH A PLAN TO HOW, UH, TO IMPROVE THE STREETS IN BEDFORD.
AND THE THREE BULLET POINTS THAT WE CAME UP WITH WAS THAT WE WERE GOING TO USE A CONDITION ASSESSMENT THAT WE HAD PERFORMED BY A COMPANY CALLED IMS. THEY PERFORMED THAT ASSESSMENT THE SUMMER OF 2022, AND WE'RE GOING TO USE THAT DATA TO HELP PLAN FOR FUTURE STREETS.
THE SECOND BULLET IS TO CONSIDER EXPANDING THE MENU OF MA MAINTENANCE OPTIONS FOR THE STREET PROGRAM.
SO A COUPLE OF YEARS AGO, THE PROGRAM WAS WE WOULD CRACK SEAL IT AND THEN WE WOULD MILL AN OVERLAY.
AND IF THEY'RE FALLING APART, IF, YOU KNOW, AT SOME POINT WE WILL RE UM, WE'LL RECONSTRUCT THE STREETS.
[00:20:01]
SO WHAT WAS MISSING WAS BETWEEN A CRACK SEAL AND A FULL MILL.AND OVERLAY WAS ANYTHING IN BETWEEN THAT MAYBE WE COULD HELP TO PRESERVE IT.
SO THAT WAS WHAT THE HIGH DENSITY MILL MINERAL BOND WAS.
IT WAS ANOTHER TECHNIQUE THAT WE COULD USE TO ADD TO OUR TOOLBOX TO HELP WITH THE PRESERVATION OF THE STREETS.
SO THERE MAY BE OTHER OPTIONS OUT THERE, BUT THAT WAS ONE OF THE ONES THAT WE HAD CHOSEN INITIALLY.
AND WE CONTINUE TO LOOK AT AND SEE IF THERE'S ANY OTHER KIND OF TECHNIQUES OR APPLICATIONS THAT WE CAN USE ON THE SYSTEM.
BUT RIGHT NOW THAT, THAT WAS THE EXPANSION TO OUR, UM, TO OUR PROGRAM.
AND THEN THE THIRD BULLET IS TO ANNUALLY RECONFIRM AND REPRIORITIZE THE STRATEGIC PLAN.
I, FROM WHAT I UNDERSTAND PREVIOUSLY, THE, THE STREETS WOULD BE CHOSEN EVERY YEAR.
AND WHAT WE'VE DONE IS WE'VE CREATED A FIVE YEAR PLAN.
AND, UM, WHEN YOU APPROVE THE BUDGET, WE APPROVE THE FIRST YEAR AND THEN THE OTHER FOUR YEARS ARE PLANNED.
BUT THERE'S AN ABILITY FOR US TO STILL ADJUST THE PLAN, MOVE STREETS AROUND, UM, YOU KNOW, CHANGE THE TIMING AND ADD OTHER STREETS AS NEEDED.
SO IT ALSO, YOU KNOW, IT DEPENDS ON WHAT OTHER PROJECTS ARE GOING ON.
IT DEPENDS ON THE CONDITION OF THE STREET, AND IT DEPENDS ON FUNDING AVAILABILITY AS WELL.
SO FOR THE FIR, UM, THIS IS, UM, IN RESPONSE TO THE FIRST BULLET.
THOSE OF YOU THAT HAVE BEEN ON THE BOARD HAVE SEEN THIS SLIDE AND MIGHT FIND THAT THE MAP AND MY SCRIPT ARE KIND OF FAMILIAR USING THE DATA FROM THE STREET ASSESSMENT.
WE'RE MAKING EFFORTS TO REDUCE THE BACKLOG AND THOSE ARE THE RED, THE RED LINES, AND WE'RE TRYING TO REDUCE THE MARGINAL STREETS WHILE COORDINATING WITH OTHER INFRASTRUCTURE WORK THROUGHOUT THE CITY.
SO THE RED IS THE POOR AND THE YELLOW AND THE ORANGE ARE, ARE THE MARGINAL STREETS.
A MAJORITY OF THE MAP IS SOME SHORTAGE, SOME SHADE OF GREEN AND GREEN IS GOOD.
SO THAT'S THE GOAL TO EAT AWAY AT THE OTHER COLORS TO INCREASE THE OVERALL PAVEMENT CONDITION.
PAVEMENT CONDITION INDEX WITHIN THE FISCAL CONSTRAINTS OF THE FOUR B BUDGET.
IN FUTURE YEARS, THE PROJECTS WILL EVENTUALLY SHIFT FROM REPAIRS AND REPLACEMENTS, HOPEFULLY TO MORE PAVEMENT PRESERVATION THROUGHOUT THE CITY.
AND IF YOU LOOK CLOSELY AT THE MAP, UM, YOU'LL SEE THIS WAS LAST YEAR'S MAP.
AND THE REASON WE SHOWED YOU LAST YEAR'S MAP, SO YOU COULD SEE IF YOU, THE BOXES IN RED, UM, EXCUSE ME, THE, THE LITTLE BLUE BOXES THERE WERE, THERE WERE RED AND, AND ORANGE.
AND WE CHOSE THOSE NEIGHBORHOODS TO TRY TO TURN THEM GREEN.
I MEAN, YOU CAN HAVE PAGES AND PAGES OF DATA, BUT THE, WHEN YOU PUT IT IN A, IN, IN A FORM THAT YOU CAN SEE, WE CAN START TARGETING WHERE THOSE REDS IN THE, IN THE YELLOWS ARE.
SO THE THIRD BULLET IN THE STRATEGIC PLAN IS TO ANNUALLY RECONFIRM AND REPRIORITIZE PROJECTS.
THIS IS THE FIVE YEAR CIP FOR THE THOROUGH AFFAIRS THAT WAS APPROVED BY THE BOARD AT THE LAST MEETING.
UM, I, UH, WE PROVIDED HARD COPIES OF THIS SO YOU COULD SEE IT.
AND THIS TABLE KIND OF SHOWS YOU WHERE, WHERE YOU ARE TODAY AND THE FUTURE THOROUGHFARE PROJECTS THAT ARE PLANNED.
AS I MENTIONED, AFTER, AFTER THIS FISCAL YEAR, THERE'S I BELIEVE ABOUT $700,000 LEFT IN THE THOROUGHFARE BOND.
SO THAT MIGHT ADJUST, UM, THE FUTURE PROJECTS MOVING FORWARD.
IT WILL, AND WE'LL HAVE TO FIGURE OUT ANOTHER FUNDING SOURCE AND, AND HOW TO, HOW TO CHOOSE THOROUGH AFFAIRS WITH THE MONEY THAT WE HAVE AVAILABLE.
SO THIS IS THE FIVE YEAR CIP FOR LOCAL STREETS.
THAT WAS APPROVED BY THE BOARD.
AND YOU SHOULD HAVE COPIES OF THIS AS WELL.
THE LOCAL STREETS ARE FUNDED WITH THE FOUR B OPERATING BUDGET.
SO THE IMS MODEL, WHICH IS FURNISHED AS PART OF THE PAVEMENT ASSESSMENT, HAS THE CAPABILITY TO ESTIMATE THE PAVING NETWORK CONDITION BASED ON EXISTING CONDITIONS WHEN THE DATA WAS, WHEN THE DATA WAS COLLECTED AND THE PROJECTS ARE COMPLETED.
THE SLIDE SHOWS A COMPARISON OF THE INITIAL NETWORK THAT WAS, UM, THAT WAS DONE IN JULY OF 22, AND THE IMPROVEMENTS TO THE NETWORK OVER THE PAST COUPLE OF STRATEGIC PLAN YEARS.
THE CHART DATED MAY, 2023, INCLUDES BEDFORD ROAD, INCLUDES BEDFORD ROAD FROM BROWN TRAIL TO CENTRAL, AS WELL AS MCCLAIN AND HUMACK.
AND THE THIRD PIE CHART SHOWS THE STREET SCORES OF THE NETWORK THROUGH OCTOBER OF LAST YEAR.
SO STARTING FROM THE LEFT, THE ORIGINAL NETWORK SCORE INDICATES THAT 75.3% OF THE STREETS WERE IN GOOD OR BETTER CONDITION.
AND FROM THE DISCUSSION WITH THE CONSULTANT, OUR BACKLOG IS ACTUALLY LOWER THAN MOST STREETS.
SO THE DISCUSSION'S ALWAYS BEEN THAT WE HAVE AWFUL, TERRIBLE STREETS OR NOT TOO FAR OFF FROM WHAT EVERYBODY ELSE IS DOING.
BUT OUR INITIAL ASSESSMENT SHOWS, LIKE I SAID, 75.3% OR 3% ARE IN GOOD OR BETTER CONDITION.
IN MAY OF LAST YEAR, WE HAD JUST COMPLETED BROWN TRAIL, UH, EXCUSE ME, BEDFORD ROAD FROM BROWN TRAIL, FROM BROWN TRAIL TO CENTRAL.
AND THINKING ABOUT HOW WIDE THAT ROAD IS AND HOW, HOW BIG THAT PROJECT WAS, WE, UM, WE GENERATED A SCORE THERE AND THE SCORE WENT FROM 75.3
[00:25:01]
TO 80.2.SO 80.2% OF THE STREETS IN THE CITY ARE IN GOOD OR BETTER CONDITION.
AND THEN IN OCTOBER, WHICH WAS THE END OF THE FISCAL YEAR, THAT'S WHEN ALL OF THE LOCAL STREETS AND ALL OF THE THIRD AFFAIRS COMPLETE, THE SCORE BECAME 80.9.
SO THE NETWORK SCORE CONTINUES TO BE INFLUENCED MORE BY THE THOROUGHFARE STREETS THAT ARE, THAT ARE IMPROVED.
SO TO SUMMARIZE, SINCE THE INITIAL STREET ASSESSMENT, THE AMOUNT OF RED, ORANGE AND YELLOW CONTINUES TO DECREASE AND THE CITY'S STREET NETWORK CONTINUES TO IMPROVE.
SO THAT'S WHERE WE ARE TODAY AND THE STRATEGIC PLAN CONTINUES TO SERVE THE CITIZENS IN BEDFORD.
WELL, AND WITH THAT, I'LL BE HAPPY TO ANSWER ANY QUESTIONS.
SO SHARON, LOOKING AT THE, UM, HOW FAR WE'VE COME, UM, OBVIOUSLY WITH THE STREETS AT, YOU SAID AN EIGHT, LIKE AN 80.9 IS KIND OF WHERE WE'RE AT BECAUSE WE'RE TAKING CARE OF THOSE THREE AFFAIRS AND, AND THAT INCREASING NUMBER, AT SOME POINT WE'RE GONNA TOP THAT YOU'RE GONNA TOP OFF BECAUSE YOU CAN, YOU CAN NEVER HAVE A HUNDRED, UH, CORRECT.
AND SO, UM, DO YOU THINK WE'RE, WE'RE REACHING THAT, THAT LIMIT, THAT CAPACITY WHERE THAT NUMBER'S PROBABLY GOING TO BE, UH, RIGHT THERE AT 80.9 OR FOR THE CONDITION OF OUR STREETS, OR, I MEAN WITH, WITH SMALL ROOM FOR GROWTH, LEMME PUT IT THAT WAY.
IF, UM, SO BETWEEN, BETWEEN THE, LEMME SEE.
MAY WAS 80.2 IN OCTOBER IT WAS 80.9.
SO THE PERCENTAGE OF INCREASE, ALTHOUGH SMALL WE'RE, YOU KNOW, ALTHOUGH SMALL THERE ARE IMPROVEMENTS.
BUT AS YOU SAID, THERE'S, YOU'RE NEVER GONNA GET TO A HUNDRED BECAUSE ON THE DAY THAT YOU PAVE IT, YOU KNOW, THE DAY AFTER THAT IT STARTS TO, IT STARTS TO DEGRADE.
SO AS, AS WE'RE RAISING THE SCORES OF SOME OF THE STREETS, THE OTHER ONES ARE STILL CONTINUING TO TO GO DOWN.
SO YOU'RE NEVER, YOU'RE NEVER GOING TO GET TO A HUNDRED UNLESS YOU PAVE THEM ALL ON THE SAME DAY.
AND IF YOU PAVE THEM ALL ON THE SAME DAY, THEN YOU KNOW, THEY, THE EXAMPLE USES, IT'S, EVERYBODY HAS THE SAME BIRTHDAY NOW, SO FIVE YEARS FROM NOW THEY'RE ALL GONNA BE IN THE SAME CONDITION.
YOU DON'T WANNA HAVE TO COME UP WITH LIKE A, YOU KNOW, A GAZILLION DOLLARS TO REPAVE THEM ALL.
WHEREAS IF YOU'RE ABLE TO, UM, IF YOU'RE ABLE TO DO IT INCREMENTALLY, TAKE LITTLE BITES OF IT IN LITTLE BITES, THEN FIVE YEARS FROM NOW, THAT'S GONNA BE YOUR LITTLE BITE AS OPPOSED TO, YOU KNOW, ALL THE STREETS IN THE CITY.
WELL STILL MAINTAINING A, A THRESHOLD THERE OF, YOU KNOW, 80%, RIGHT? AND SO GIVE OR TAKE, YOU KNOW, HAVING MOST OF OUR STREETS THERE IN 80% GOOD CONDITION, SO, AND 80 IS ACTUALLY A REALLY GOOD SCORE.
SO COMPARED TO TO COMPARED TO, UM, THE GOAL THAT I'VE SEEN IN OTHER CITIES, EIGHTIES, PRETTY DARN GOOD.
SO REMIND ME WHERE WE WERE BEFORE, BEFORE WE STARTED ALL THIS WHOLE PROCESS.
WHAT WAS THE AVERAGE FOR THE CITY SITTING IN THE 70 70? IT WAS IN THE SEVENTIES.
I DON'T RE I DON'T REMEMBER WHAT THE NUMBER WAS.
I'LL, OKAY, YEAH, I'LL, YEAH, MAYBE FOR THE NEXT TIME.
JUST, JUST, JUST SO YOU KIND OF WHERE WE, WHERE WE'VE COME FROM, RIGHT.
AND FROM, FROM THE, THE METHODS THAT WE'VE CHANGED AND HOW WE, HOW WE FUND THESE STREETS AND HOW WE'RE TAKING LITTLE BITS OF, AND, YOU KNOW, STREETS AT A TIME HERE, UH, TO RAISE THE, THE OVERALL SCORE AND UM, AND BE, UH, BASICALLY, YOU KNOW, MORE JUDICIOUS IN, IN HOW WE DECIDE WHERE TO SPEND THE MONEY.
SO CHERYL, WHAT'S THE LIFE'S AVERAGE LIFESPAN OF A, OF A STREET WOOD ROAD OR CENTRAL? SUPPOSED TO BE ABOUT 40 YEARS, 40 TO 50 YEARS DEPENDING ON HOW MUCH TRAFFIC, HOW MUCH USE OTHER OF OUR RELATIONS PERCENTAGES.
WE WERE TOLD THAT OUR BACKLOG IS ACTUALLY REALLY VERY GOOD BECAUSE OUR BACKLOG WHEN WE HAD THE ASSESSMENT WAS 2.4.
AND WHAT WE WERE TOLD IS THAT'S WAY BETTER THAN A LOT OF OTHER CITIES THAT THEY HAVE, UM, THE STREETS THAT THEY HAD ANALYZED.
AND I THINK AT THE TIME THAT WE DID THE ASSESSMENT, A LOT OF THE THOROUGHFARE HAD UM, NOT BEEN IMPROVED IN A WHILE.
SO THAT'S WHY THERE WAS SUCH A BIG FOCUS ON THE THOROUGHFARES.
AND LIKE I SAID, THE THOROUGH AFFAIRS SEEMS TO CARRY THOSE SCORES, UM, A LOT FURTHER THAN, THAN THE LOCAL STREETS DO.
ANYBODY ELSE HAVE ANY QUESTIONS FOR CHERYL? ALRIGHT, GREAT JOB CHERYL.
I THINK YOU KEPT IT TO LIKE 29 MINUTES.
UM, ALL RIGHT, SO NEXT UP WE HAVE, UH, RECEIVED FOUR B FINANCIAL STATUS REPORT AS OF DECEMBER 31ST, 2023.
GIVE YOU ASSISTANT CITY MANAGER KAREN RIGGS.
HOW ARE YOU TONIGHT? I'M DOING WELL.
[00:30:01]
PASSED ON SOME GERMS TO ME, SO THERE YOU GO.UM, SO YES, SO I HAVE A STATUS UPDATE FOR YOU.
WE WERE ONLY ONE QUARTER AND ONE MONTH INTO THIS FISCAL YEAR.
I WAS HOPING WITH, WE DELAYED THIS THAT I'D HAVE JANUARY NUMBERS FOR YOU, BUT WE HAVEN'T CLOSED JANUARY, SO I LEFT IT WITH DECEMBER.
'CAUSE THOSE ARE OUR TRUE ACTUAL NUMBERS AS OF RIGHT NOW.
UM, SO SALES TAX FOR DECEMBER CAME IN AT ABOUT, UH, 1.545% HIGHER THAN DECEMBER OF LAST YEAR.
SO SLOWING DOWN A LITTLE BIT, BUT STILL SOME GROWTH.
I WILL TELL YOU WE DO HAVE JANUARY SALES TAX AND IT CAME IN AT UH, 3.51% HIGHER THAN THE JANUARY OF LAST YEAR AND WE SHOULD GET FEBRUARY TOMORROW.
UM, ON THE INTEREST SIDE, UM, JUST TO KINDA GIVE YOU SOME COMPARISON OF WHERE WE WERE THIS TIME LAST YEAR, DECEMBER OF 22.
YEAR TO DATE INTEREST WAS 24,000.
DECEMBER 23 YEAR TO DATE IS 64,000.
SO OUR FINANCE DIRECTOR IS DOING A PHENOMENAL JOB OF REALLY, REALLY TAKING ADVANTAGE OF THE INTEREST RATE MARKET AND LOCKING IN SOME LONG-TERM RATES.
SO THAT'S REALLY EXCITING TO GIVE US MORE FUNDS TO CONTINUE UH, IMPROVING THAT SCORE.
SO, UM, EXPENSES, WERE ABOUT 400,000 FOR THE YEAR.
OBVIOUSLY WE HAVE SOME BIG CAPITAL PROJECTS THAT HAVE NOT BEEN SPENT YET AS OF DECEMBER 31ST, BUT WE'RE DOING PRETTY GOOD.
SO THAT'S REALLY ALL I HAVE FOR YOU.
SO, UM, LOOKING AT, LOOKING AT THE FINANCIALS AND MM-HMM.
UM, WE, WE ACTUALLY WERE PRETTY AGGRESSIVE.
IT LOOKED LIKE, YOU KNOW, LAST YEAR LOOKING AT OUR LOCAL STREETS, WE SPENDING I THINK IT WAS WHAT, ABOUT 5 MILLION ON LOCAL STREETS OVER THE COURSE OF A COUPLE OF YEARS? YES.
AND SO DO WE SEE IT SLOWING DOWN A LITTLE BIT? UH, GOING INTO NEXT YEAR? PROBABLY SO JUST BECAUSE FROM A FUNDING MECHANISM, WE'RE RUNNING OUT OF, WE'RE NOT RUNNING, BUT WE ARE, WE'VE DIPPED INTO OUR FUND BALANCE OVER THE LAST COUPLE OF YEARS.
SO FOR THIS YEAR WHAT WE'RE, WE'RE ESTIMATING WE'LL HAVE ABOUT, UM, 1.8 MILLION IN EXCESS OF OUR FUND BALANCE.
SO FOR THOSE OF YOU THAT ARE NEW TO OUR BOARD, THE FUND BALANCE POLICY FOR THE FOUR B IS ONE TIMES THEIR ANNUAL DEBT SERVICE PAYMENT.
SO WE'RE REQUIRED TO KEEP ROUGHLY 665,000 IN FUND BALANCE TO PAY THAT FUTURE DEBT SERVICE.
AND SO OUR EXCESS THAT WE'RE PLANNING IS ABOUT 1.8 MILLION.
SO WE ARE LIMITED IN OUR FUTURE PLANS.
WE DID MAKE SOME CHANGES THIS YEAR TO THE BUDGET TO KIND OF GIVE US A LITTLE BIT OF AN OPPORTUNITY TO KIND OF BUILD THAT FUND BALANCE A LITTLE BIT GOING INTO 24, 25.
AND WE'LL PROBABLY LOOK AT DOING SOMETHING LIKE THAT AS AGAIN, AGAIN, THAT'S A TRANSFER THAT WE WERE DOING TO ANOTHER FUND AND WE KIND OF HELD OFF FOR ONE YEAR JUST TO KIND OF GIVE THAT FUND BALANCE A LITTLE BIT OF GROWTH.
SO, AND WE'RE HOPING WITH SALES TAX GROWTH AND INTEREST, THAT'LL GIVE US MORE OPPORTUNITIES TO ADDRESS SOME OF THOSE CAPITAL NEEDS.
ALRIGHT, ANYBODY HAVE ANY QUESTIONS FOR MISS KAREN? OKAY.
ALRIGHT, UM, SEEING THERE'S NO MORE, UH, ITEMS ON THE AGENDA HERE, UM, I GUESS I WILL ENTERTAIN A MOTION FOR ADJOURN THIS MEETING.
I'LL DO, I GOT A MOTION TO ADJOURN FROM DIRECTOR SCHULTZ.