GOOD QUESTION. GREETINGS, FOLKS.

[CALL TO ORDER]

[00:00:05]

A LITTLE BIT AFTER 530, BUT WE ARE GOING TO START OUR ITEM THAT HAS TO DO WITH PRESENTATION.

I. ALL THE MEETING OF THE BEDFORD PLANNING AND ZONING COMMISSION TO ORDER FOR THIS PRESENTATION.

WE WILL START HERE AT THIS END, PLEASE.

COMMISSIONER, STATE YOUR NAME AND THAT YOU'RE PRESENT FOR THE RECORD.

TERRY SMITH. PRESENT.

ROGER GALLENSTEIN PRESENT.

TOM JACOBSON PRESIDENT.

BRIAN HENDERSON PRESIDENT.

BRUCE EMERY PRESIDENT.

STEVE OTTO PRESIDENT.

KATE BARLOW PRESENTS.

ALL RIGHT. THAT'S ALL OF OUR COMMISSIONERS AND ALL THE COMMISSIONERS THAT ARE HERE THIS EVENING WILL BE IN A POSITION TO VOTE.

WE HAVE A COUPLE OF MEMBERS THAT ARE MISSING THIS EVENING.

SO ALL COMMISSIONERS HERE, WE'LL GO BACK THROUGH THIS AGAIN ON OUR REGULAR SCHEDULE MEETING AT SIX.

SO THIS ITEM POSTED SEPARATELY, NO ACTION FROM THE PLANNING AND ZONING ON THIS ITEM, BUT WE ARE HERE TO RECEIVE A PRESENTATION FROM THE TRINITY RIVER

[PRESENTATION]

AUTHORITY DISCUSSING AND LISTENING TO THEIR PLANS FOR FUTURE EXPANSION AT THE SITE ON MEADOWOOD ADDITION.

SO FIRST OF ALL, I HAVE AN INTRODUCTION FROM STAFF.

THANK YOU, MR. CHAIRMAN. COMMISSIONERS, I JUST WANT TO BRIEFLY EXPLAIN THE PURPOSE OF TONIGHT'S PRESENTATION.

THIS IS THIS IS PURELY INFORMATIONAL FOR PLANNING AND ZONING COMMISSION AND THE GENERAL PUBLIC.

AT THE LAST PUBLIC HEARING REGARDING THE PLAT, WE HEARD A LOT OF COMMENTS FROM THE GENERAL PUBLIC JUST WANTING TO KNOW WHAT WAS GOING TO HAPPEN.

THEY UNDERSTOOD THE PLATTING PROCESS, BUT THEY REALLY JUST WANTED TO KNOW WHAT WHAT WAS PLANNED FOR THE SITE.

SO WE WORKED WITH TARA FOLKS TO AND THEY AGREED TO COME AND PRESENT AT THIS 530 WORK SESSION.

SO AGAIN, THIS IS JUST INFORMATIONAL.

YOU HAVE NO ACTION ITEM HERE TONIGHT.

IT'S PURELY JUST TO TAKE A PRESENTATION.

AND WITH THAT, I WILL TURN IT OVER TO TARA.

FOLKS, WOULD YOU PLEASE INTRODUCE THEM? SURE WE HAVE. I WILL LET THEM INTRODUCE THEMSELVES.

THEY KNOW THEMSELVES BETTER THAN I DO.

THANKS, CHARLIE. CAN YOU ALL HEAR ME SO FAR? ALL RIGHT. EXCELLENT. GOOD EVENING.

THANK YOU ALL FOR HAVING US.

I'M CHARLIE IRWIN.

I'M WITH FREESE AND NICHOLS.

I'M THE PROJECT MANAGER, THE DESIGN MANAGER FOR THE TRINITY RIVER AUTHORITY.

AND WE'VE BEEN WORKING ON THIS PROJECT FOR A FEW YEARS NOW.

SO ONE OF THE THINGS THAT WE HEARD AT THE LAST AT THE LAST PUBLIC HEARING WAS THERE'S A LOT OF CONCERN ABOUT WHAT'S GOING TO HAPPEN AT THIS SITE AND WHAT IS THE CHARACTERISTIC OF THE SITE GOING TO LOOK LIKE. SO WE'RE HOPING THAT THIS WORKSHOP COULD HELP ALLEVIATE SOME OF THOSE CONCERNS AND LET YOU ALL KNOW WHAT WE'RE GOING TO DO.

SO NEXT SLIDE OR I GUESS I HAVE THAT CONTROL RIGHT HERE.

OKAY. SO TO STEP BACK, WE'LL DISCUSS WHO IS THE TRINITY RIVER AUTHORITY AND WHAT IS THE TARRANT COUNTY WATER SUPPLY PROJECT? BECAUSE THE MURPHY DRIVE PUMP STATION SITE NEST WITHIN THIS LARGER ORGANIZATION.

SO TRINITY RIVER AUTHORITY, ALSO KNOWN AS TIERRA OR THE AUTHORITY, THEY THEY ARE RESPONSIBLE FOR THE TRINITY RIVER.

PART OF THEIR RESPONSIBILITY, SPECIFICALLY IN NORTH TEXAS, IS WITH THE TARRANT COUNTY WATER SUPPLY PROJECT.

SO THAT NAME MAY BE A LITTLE MISLEADING BECAUSE PROJECTS ARE TYPICALLY SOMETHING THAT START AND END.

BUT THIS IS SOMETHING THAT IS IN CONTINUATION BECAUSE THE TARRANT COUNTY WATER SUPPLY PROJECT, THEY TAKE RAW WATER FROM LAKE ARLINGTON AND THEY HAVE A PUMP STATION.

THEY MOVE THAT UP INTO EULESS TO THE WATER TREATMENT PLANT.

THEY TREAT THAT WATER AND THEN THEY PUSH THAT WATER OUT TO FIVE DIFFERENT MEMBER CITIES.

SO THERE'S AT LEAST A QUARTER MILLION PEOPLE THAT TAKE THAT WATER FROM THE WATER SUPPLY PROJECT OUT OF LAKE ARLINGTON.

AND THEN THAT WATER EVENTUALLY ENDS UP AT THE MURPHY DRIVE PUMP STATION.

SO THOSE FIVE MEMBER CITIES THAT ARE CUSTOMERS WITH NINE DIFFERENT DELIVERY POINTS ARE NORTH RICHLAND HILLS, COLLIERVILLE, GRAPEVINE, EULESS, AND THEN ALSO BEDFORD. AND BEDFORD HAS TWO DELIVERY POINTS.

YOU'VE GOT A BEDFORD NORTH AND A BEDFORD SOUTH, WHICH THE WATER SUPPLY.

THAT'S WHERE YOUR POTABLE WATER COMES FROM.

SO WE'VE GONE OVER THIS A LITTLE BIT.

I WON'T READ ALL THE SLIDES TO YOU, BUT A COUPLE OF THINGS TO KEY IN ON THE WATER SUPPLY PROJECT.

THEY CAN GENERATE ABOUT 87 MILLION GALLONS OF WATER PER DAY.

THIS MURPHY DRIVE PUMP STATION SITE DEPENDING ON THE DAY OF YEAR BECAUSE THAT'S SEASONAL USAGE.

THEY MAY BE PUSHING 6 MILLION GALLONS OF WATER PER DAY OR IN PEAK FLOWS.

87 IS WHAT THEY CAN TREAT, BUT THEY CAN ALSO STORE IN THOSE LARGER GROUND STORAGE TANKS THAT ARE ON SITE.

THEY CAN STORE UP TO 20 MILLION GALLONS OF WATER PER DAY.

SO THIS PUMP STATION IS EQUIPPED TO BE ABLE TO PUSH UP TO 100 MILLION GALLONS OF WATER PER DAY OUT TO THOSE FIVE CITIES.

[00:05:02]

THE AUTHORITY BEGAN PROVIDING WATER TO THE CITY IN 1974.

THE ORIGINAL MURPHY DRIVE PUMP STATION CAME OUT OF THE GROUND AROUND 1980, AND THAT'S WHEN THE WATER SUPPLY PROJECT WAS ABLE TO REALLY BOOST THAT WATER PRESSURE AND GET IT OUT TO THOSE FIVE CITIES.

AND THE CURRENT BUILD OUT IS AROUND 94 MGD MILLION GALLONS PER DAY.

SO THIS IS A AERIAL GOOGLE VIEW OF THE EXISTING PUMP STATION.

SO THIS IS LOOKING NORTH IS ON THE LEFT SIDE OF THE SCREEN.

SO YOU HAVE TWO PUMP STATION BUILDINGS.

THOSE ARE BUILT SEPARATELY.

THERE'S THE ONE FURTHEST TO THE NORTH HAS FIVE PUMPS AND THE ONE TO THE SOUTH, THAT'S FOUR PUMPS.

THEY'RE ALL GETTING TOWARD THE END OF THEIR LIFE CYCLE.

AND THEN WE HAVE FOUR, 5 MILLION GALLON GROUND STORAGE TANKS, TWO OF WHICH HAVE RECENTLY BEEN REHABILITATED.

AND THEN ALSO NOTE ON THIS SLIDE THAT THERE'S AN EXISTING DRIVEWAY ON THE NORTH SIDE.

THAT'S THE MAIN ACCESS TO THE SITE ON THE SOUTH END OF THE SITE.

THERE'S ALSO ACCESS, BUT THAT IS THAT'S NOT PAVED.

THAT'S FOR CONSTRUCTION ACCESS OR OTHER LARGE VEHICLES.

SO IF YOU WERE TO BRING IN A VEHICLE OFF OF MURPHY DRIVE, YOU LOOP IT AROUND AND THEN YOU TAKE IT OUT THE SOUTH END.

AND THERE'S ALSO SEVERAL.

PARDON ME. THERE'S ALSO SEVERAL PIPELINES COMING IN AND OUT OF THIS SITE.

THERE THERE'S A PIPELINE COMING FROM THE WATER TREATMENT PLANT INTO THE SITE.

IT FEEDS ALL FOUR OF THESE TANKS.

AND THEN THERE'S PIPE THAT ON THE OPPOSITE SIDE OF THE TANKS, THAT'S OUR SUCTION PIPING THAT GOES OUT TO THE EXISTING PUMP STATION.

AND THEN FROM THE PUMP STATION, THERE'S THREE DIFFERENT PIPELINES THAT GO TO THE NORTH.

AND THEN THERE'S ALSO ONE THAT COMES TO THE SOUTH, TO THE CITY OF BEDFORD.

SO THERE'S THERE'S A WHOLE LOT GOING ON ON THIS SITE.

AND SO THIS MOST RECENT PUMP STATION, THIS ONE THAT YOU SEE ON THE LEFT, LEFT THE NORTHERNMOST PUMP STATION BUILDING THAT WAS DONE IN AROUND 1987. THERE'S BEEN A NUMBER OF UPGRADES OVER THE YEARS TO TRY TO CONTINUE THE LIFE CYCLE OF THAT ASSET AND TO PUSH THAT OUT.

AND THE AUTHORITY WAS LOOKING AT AN OPPORTUNITY TO UPGRADE SOME OF THE ELECTRICAL GEAR IN THERE.

BUT FROM A CONSTRUCTABILITY OPPORTUNITY, IT JUST THEY COULDN'T DO IT.

THEY CAN'T MAKE THAT REPLACEMENT AND CONTINUE TO PROVIDE WATER TO THESE FIVE CITIES AND DO THAT ELECTRICAL REPLACEMENT.

SO THAT WAS A LARGE DRIVER FOR NEEDING SOME NEW ASSETS.

SO ONE OF THE MAIN THINGS THAT THIS PROJECT IS GOING TO DO WITH THAT SECOND BULLET IS IT'S GOING TO REPLACE THESE EXISTING ASSETS TO TO IMPROVE RELIABILITY AND REDUNDANCY. THE PUMP STATION WORKS.

IT'S FUNCTIONAL RIGHT NOW.

BUT JUST LIKE THINGS AT YOUR OWN HOME, IT'S COMING TO THE END OF ITS LIFE CYCLE AND EVENTUALLY YOU'VE GOT TO REPLACE THAT WATER HEATER OR AIR CONDITIONING UNIT.

AND THERE'S ONLY SO MANY TIMES YOU CAN REPLACE THE PARTS.

YOU'VE GOT TO REPLACE THE WHOLE THING.

SO THE EXISTING ONE OF THE BIG CONSTRAINTS AND ONE OF THE BIG DRIVERS IS THE EXISTING PUMP STATION HAS IT MUST REMAIN IN OPERATION DURING CONSTRUCTION. WE'VE GOT TO KEEP THIS THING GOING WHILE THE NEW PUMP STATIONS ARE BEING BUILT AND THEN THE EXISTING ONES CAN BE TAKEN DOWN.

AND SO WE'RE TRYING TO DO THAT ON A SITE THAT ALREADY HAS A LOT OF UNDERGROUND ASSETS AND PIPELINES GOING IN AND OUT TO THE FIVE DIFFERENT CITIES.

WE'RE TRYING TO SEE WHERE WE CAN FIT ALL OF THIS IN.

SO WE'LL CAMP ON THIS SLIDE FOR A LITTLE BIT BECAUSE THIS THIS WAS SOMETHING THAT'S NOT IN THE IN THE EXHIBITS FOR THE PLATTS, BUT THIS IS SOME INFORMATION WE WANTED TO SHARE WITH THE PUBLIC SO YOU ALL CAN HAVE A BETTER IDEA OF WHAT'S HAPPENING.

IS THERE A LASER POINTER ASSOCIATED WITH THIS? LET'S THANK YOU. THANK YOU.

ALL RIGHT. I'M GOING TO POINT.

OH, THAT'S OKAY.

OKAY. ALL RIGHT.

SO WE'LL WORK FROM NORTH TO SOUTH.

SO LEFT OR RIGHT.

SO ONE OF THE THINGS THAT ONE OF THE NEIGHBORS NOTICED AND QUITE ASTUTELY IN THE LAST MEETING, I HEARD THEM TALKING ABOUT IT, THEY'RE LOOKING AT THE PLAT IN THIS NEW ROAD AND THEY SAID, HEY, THIS NEW ROAD, LOOK, LOOK AT WHERE THIS NEW ROAD IS.

IT'S GOING THROUGH AN EXISTING BUILDING.

THEY'RE GOING TO BE BUILDING SOMETHING NEW.

SO WE WANT TO SHOW WHAT THIS IS.

SO IF YOU LOOK AT THE WESTERN SIDE OF SITE, THE BOTTOM BOTTOM OF THIS PAGE, YOU SEE THE NEW PUMP STATION AND THAT NEW PUMP STATION WILL SHOW YOU WHAT IT LOOKS LIKE ON THE INSIDE IN A MOMENT. BUT THAT NEW PUMP STATION WILL IT'S GOING TO HOUSE THE PUMPS, THE PIPING, THE VALVES, AND THEN THOSE ARE

[00:10:10]

GOING TO BE DRIVEN BY VARIABLE FREQUENCY DRIVES THAT WILL ALLOW THE AUTHORITY TO BETTER TAILOR THE FLOWS THAT ARE GOING OUT TO THE CITIES TO SO THEY CAN GO FROM SIX UP TO 100 MILLION GALLONS PER DAY OF WHAT THEY'RE PUSHING OUT.

SO WE HAVE A NEW ELECTRICAL BUILDING.

A BIG PART OF THIS IS WORKING WITH THE POWER UTILITY.

WE HAVE TO BRING IN NEW POWER TO FEED THIS GEAR AND THIS EQUIPMENT.

AND SO ARE WE GOING TO PUT THAT WHILE WE'RE NOT ONLY DO WE NEED NEW POWER, BUT WE HAVE TO MAINTAIN THE EXISTING POWER ON SITE SO WE CAN KEEP THOSE EXISTING PUMP STATIONS RUNNING.

SO THE THE BACKYARD THAT THE AUTHORITY PURCHASED AND IS PART OF THE REPLAT ON THIS NORTHERNMOST PART OF THE SITE, THAT WHAT'S GOING TO GO THERE AND WE'LL SHOW PICTURES EXAMPLE PICTURES OF OF WHAT WE EXPECT TO LOOK LIKE THEY'RE GOING TO BE PAD MOUNTED SWITCHGEAR AND PAD MOUNTED TRANSFORMERS. SO IT'S ELECTRICAL GEAR THAT'S GOING TO BE MOUNTED ON THE GROUND.

SOMETHING ELSE THAT THE POWER UTILITY ENCORE IS GOING TO DO IS THE OVERHEAD ELECTRIC THAT'S IN THE BACK THERE.

THEY'RE GOING TO BURY THAT ALONG THE BACK SIDE OF THE PROPERTY.

SO THOSE OVERHEAD LINES, THOSE ARE GOING UNDERGROUND.

ALSO ON SITE.

SO YOU SEE THE NEW DRIVEWAY.

THAT'S AN EMERGENCY ACCESS VEHICLE DRIVE.

CODE. AND SOME OF THE REQUIREMENTS HAVE CHANGED IN THE LAST 42 YEARS.

43 YEARS.

SO WE NEED A WIDER DRIVEWAY AND.

WE'RE GOING TO TAKE THAT EMERGENCY VEHICLE ACCESS DRIVE.

THAT'S NOT THAT'S NOT GOING TO BE INTENDED FOR DAILY USE.

THAT'S GOING TO BE GATED AND CLOSED.

SO WE'RE NOT EXPECTING VEHICLES TO GO IN AND OUT OF THERE.

THE EXISTING DRIVEWAY IS WHERE WE ANTICIPATE MAIN ACCESS TO BE.

ALSO NOT SHOWN ON THIS SITE, BUT YOU CAN SEE THE EMERGENCY VEHICLE ACCESS DRIVE FROM THE SOUTH.

THE AUTHORITY IS GOING TO PUT IN A FLEX BASE.

SO IT'S LIKE A GRAVEL MATERIAL.

THEY'RE GOING TO BRING IN A GRAVEL ROAD SO THAT THEY HAVE AN ALL WEATHER ROAD FROM THAT SOUTH END TO THE NORTH END.

SO THEY'RE NOT RUTTING UP THE GRASS BACK THERE.

THAT'S OVER THE PIPELINES.

SO WE'LL. WE HAVE TANKS.

ONE, TWO, THREE AND FOUR.

WE'RE GOING TO BRING A ROAD UP FROM THE SOUTH.

IT'S GOING TO BE FLEX BASE GRAVEL.

AND THEN THAT ACCESS ROAD IS WHAT WINDS ITS WAY AROUND TO THAT EMERGENCY ACCESS DRIVE.

SO WE'VE COVERED THE EXISTING ACCESS.

WE'RE GOING TO KEEP THAT. WE'VE TALKED ABOUT THE EMERGENCY VEHICLE ACCESS DRIVE.

AND SO THAT EMERGENCY VEHICLE ACCESS DRIVE IS ALSO GOING THAT'S GOING TO BE ROUTED THROUGH THE PROPERTY THAT WAS PURCHASED ALONG MURPHY DRIVE.

AND THAT HOUSE HAS ALREADY BEEN DEMOLISHED.

AND THEN SO BETWEEN THE EXISTING DRIVE, THE NEW EMERGENCY ACCESS DRIVE, WE'RE GOING TO BE GOING TO BE EMERGENCY BACKUP GENERATORS.

SO IN THE WINTER OF 2021, WE HAD THE BIG SNOWMAGEDDON, THE BIG POWER FAILURE AND THE ICE STORM AND.

SO SOME OF THE UTILITIES IN NORTH TEXAS WERE KNOCKED OUT.

AND WHEN I SAY UTILITIES, SPECIFICALLY WATER UTILITIES.

THAT WAS A THAT WAS A BIG LESSON FOR A LOT OF A LOT OF CITIES, A LOT OF MUNICIPALITIES.

AND THE STATE PUT OUT SENATE BILL THREE AND THAT REQUIRED ALL THE UTILITIES AND CITIES AND ANYBODY WHO'S PROVIDING WATER TO PUT TOGETHER THESE EMERGENCY RESPONSE PLANS AND THESE EMERGENCY PREPAREDNESS PLANS.

AND SO PART OF THAT IS HOW DO WE KEEP WATER FLOWING? HOW DO WE MAINTAIN WATER PRESSURE IN THESE SYSTEMS SO THAT WE DON'T HAVE TO ISSUE BOIL WATER NOTICES SO THAT WE CAN MAKE SURE YOU CONTINUE TO HAVE WATER DURING THESE FREEZES? AND A BIG PART OF THAT IS, ONE, IT'S LOOKING AT MAKING SURE YOU HAVE WHATEVER IT IS YOU NEED TO TREAT YOUR WATER AT YOUR WATER TREATMENT PLANT, BUT IT'S ALSO LOOKING AT YOUR POWER AND.

YOU CAN. YOU CAN DEAL WITH YOUR POWER A COUPLE OF DIFFERENT WAYS.

YOU CAN BRING IN A DEDICATED POWER LINE THAT COMES FROM A COMPLETELY DIFFERENT SUBSTATION FROM IN THIS AREA.

IT'D BE ENCORE.

SO THERE'S A PRETTY SIGNIFICANT COST THAT'S ASSOCIATED WITH THAT.

BUT THEN YOU'RE ALSO YOU'RE ALSO BEHOLDEN AND THAT'S A RISK MANAGEMENT QUESTION YOU HAVE TO ASK YOURSELF WHEN YOU'RE TRYING TO MAKE A MORE RELIABLE, RESILIENT PLACE, LIKE, HEY, IF I'M TRYING TO IF I'M TRYING TO MAKE SURE WE CAN CONTINUE TO DELIVER WATER AND I'M WORRIED ABOUT POWER GOING OUT OVER HERE, WELL, WHY WOULDN'T I BE WORRIED ABOUT POWER GOING OUT OVER HERE? SO ONE OF THE WAYS YOU MITIGATE THAT IS YOU GET BACKUP GENERATORS.

SO THIS PROJECT INCLUDES BACKUP GENERATORS.

SO ON THOSE DAYS WHEN IT'S FREEZING, YOUR PIPES ARE FREEZING AND AND FOLKS ARE TRYING TO RUN THEIR WATER OR.

[00:15:09]

THE AUTHORITIES PUSHED A TON OF WATER.

THEY'RE NOT GOING TO BE SUSCEPTIBLE TO LOSING POWER BECAUSE ONCOR SHUT THEM OFF.

SO THAT'S WHAT THESE GENERATORS ARE THERE FOR.

AND THEN ALSO PART OF THIS PROJECT.

SO WE'VE TALKED. WE'VE TALKED ABOUT THE THINGS THAT ARE THERE FOR MOVING WATER.

WE'VE TALKED ABOUT THE THINGS THAT ARE THERE TO BACK UP THE WATER AND THE POWER AND WHAT ENCORE IS GOING TO PROVIDE WITH THESE PAD MOUNTED SWITCHES ON THE NORTH END OF THE PROJECT. SO SOMETHING ELSE SITE RELATED THERE.

THERE ARE TWO ADDITIONAL TANKS THAT HAVE NOT BEEN REHABILITATED YET.

SO TANKS, NUMBER ONE AND FOUR.

THE ONE ON THE NORTH END AND ON THE SOUTH END, THOSE HAVE BEEN REHABILITATED THE LAST COUPLE OF YEARS.

THE LAST ONE TOOK LONGER THAN ANTICIPATED, AND WE DON'T WANT THAT TO HAPPEN AGAIN.

BUT THIS PROJECT IS GOING TO GO AHEAD AND KNOCK OUT THOSE OTHER TWO TANKS, GET THOSE REHABILITATED.

AND SO THE PURPOSE OF THIS IS TO HAVE NEW ASSETS, REHAB ON THESE TANKS SO WE CAN PUSH OUT ANY SORT OF OTHER LARGE MAINTENANCE ANOTHER 20 OR 30 YEARS ON THESE TANKS AND MAYBE 40 YEARS ON THESE PUMP STATIONS.

AND IN ADDITION TO THE SITE.

THERE'S PART OF THE SITE THAT WAS TAKEN IN THAT WOULD NECESSITATE NEW FENCING.

SO IN THE ORIGINAL FENCING, WE'RE LOOKING AT CHAIN LINK WITH THE PRIVACY SLATS THAT THAT'S CURRENTLY THERE.

BUT IN IN RESPONSE TO SOME OF THE THINGS WE HEARD LAST MONTH ON FEBRUARY 9TH, WE'RE CHANGING THAT APPROACH AND WE'RE LOOKING AT A MORE SUBSTANTIAL PRIVACY FENCE, A COMPOSITE FENCE, AND WE'LL SHOW YOU A PICTURE OF WHAT WE KIND OF THINK THAT WOULD LOOK LIKE.

AND AND THE INTENT IS NOT TO JUST DO THAT WHERE WE'RE WHERE WE'VE TAKEN IN NEW NEW LAND PART OF THIS REPLAT, BUT TO DO THE ENTIRE SITE PERIMETER SO EVERYONE GETS THE SAME COMPOSITE FENCE.

I'M SORRY, YOU'RE SAYING ANYBODY THAT BACKS UP TO THAT PROPERTY WILL.

YES. ANYBODY? ANYBODY ALONG.

SO ALONG THE BACKSIDE OF THE MURPHY DRIVE, I MEAN, ALL OF THE FENCE REPLACED WITH THIS COMPOSITE FENCE, IT WILL BE A EIGHT FOOT FENCE.

SO THE STATE STATE HAS A MINIMUM REQUIREMENT, SAFETY REQUIREMENTS AND THOSE NEST WELL WITH THE CITY'S FENCE REQUIREMENTS.

SO. SO THIS WILL BE AN EIGHT FOOT FENCE.

AND SO NEXT SLIDE.

SO THIS IS THIS IS WHAT WE EXPECT THE BUILDING TO LOOK LIKE.

IT'S NOT GOING TO BE A METAL BUILDING.

IT'S GOING TO BE MASONRY.

IT'S GOING TO BE TWO TONED.

SO WE'RE NOT LOOKING FOR SOME LARGE CMU INSTITUTIONAL PRISON LOOKING BUILDING OR A JUNIOR HIGH THAT WAS BUILT IN THE 30S OR 40S.

ARE THE DIMENSIONS OF THAT.

I THE.

THERE'S A 35FT.

IT'S 35FT.

SO ONE OF THE THINGS THAT WE NEEDED ON THE HEIGHT THAT DROVE THE HEIGHT OF THE BUILDING WAS THESE PUMPS.

AND WE'LL SHOW YOU IN THIS NEXT PHOTO.

THESE PUMPS AND THE MOTORS ON TOP OF THEM.

WE NEED TO BE ABLE TO PICK THEM UP AND MOVE THEM AND THEN PUT THEM ON A TRUCK.

SO THIS IS THE INSIDE OF THE OF THE PUMP STATION BUILDING ITSELF.

SO SOMETHING WE HAD TO DO.

THIS IS KIND OF INSIDE BASEBALL HERE, BUT SOMETHING WE HAD TO DO DURING DESIGN WAS WE HAD TO SKEW THESE PUMPS.

THEY'RE ON A 45 DEGREE.

AS THE ENGINEERS, WE LIKE EVERYTHING TO BE RIGHT ANGLES, 90 DEGREES.

I MEAN, THAT'S JUST A REALLY GOOD WAY TO DO BUSINESS, BUT THAT TAKES UP MORE SPACE.

AND SO IN THIS LEFT RIGHT DIMENSION, YOU'RE LOOKING AT THE EAST WEST.

WE DIDN'T HAVE ROOM TO DO THAT ON SITE, SO WE HAD TO SKINNY UP OUR BUILDING AND WE SKEWED THESE PUMPS.

EXCUSE ME, IS THIS PUMP SITTING ON MURPHY DRIVE WHERE THE HOUSE USED TO BE? NO, NO, THIS IS THIS IS THIS IS IN THIS BUILDING THAT'S CALLED NEW PUMP STATION BUILDING.

AND THEN SO IN THE BACKYARD WHERE I TALKED ABOUT THOSE PAD MOUNTED SWITCHES, THAT ELECTRICAL GEAR, THIS IS WHAT IT WILL LOOK LIKE.

SO THIS IS THE EXISTING ELECTRICAL GEAR THAT'S ON SITE BEHIND THE EXISTING BUILDINGS FOR SCALE.

YOU CAN SEE HOW TALL THEY ARE.

THIS GEAR IS HOW TALL IT IS NEXT TO THAT BUILDING.

AND THIS IS WHAT A NEW ONE WILL LOOK LIKE.

THIS IS AT A DIFFERENT SITE.

THIS IS ACTUALLY AT THE SITE WHERE THE AUTHORITY PULLS THE RAW WATER OUT OF LAKE ARLINGTON.

THIS IS A NEW PROJECT THAT THE AUTHORITY DID JUST RECENTLY AND COMPLETED CONSTRUCTION, THE LAKE ARLINGTON RAW WATER PUMP STATION.

[00:20:03]

BUT ON THE LEFT SIDE, YOU HAVE A PAD MOUNTED SWITCH.

AND THEN ON THE RIGHT SIDE YOU HAVE THE TRANSFORMER.

AND THIS THIS ORIENTATION ON THIS RENDERING ISN'T THE ORIENTATION THAT IS GOING TO BE ON SITE, BUT THAT GIVES AN IDEA OF THE GENERATOR.

SO ONE OF THE THINGS WITH THESE GENERATORS IS THEY HAVE SOUND ATTENUATING ENCLOSURES.

THEY'RE EMERGENCY GENERATORS.

SO IT'S NOT JUST A THEY'RE NOT JUST GOING TO USE IT TO RUN THE PUMPS.

AND THE SOUND ATTENUATING ENCLOSURES ARE MEANT TO REDUCE THAT SOUND.

AND WHILE WE'RE WHILE WE'RE ON THE TOPIC OF SOUND REDUCTION AND FENCING, SO THIS FEEDS INTO FENCING, ONE OF THE FIRST THINGS WE WANT TO DO IN THE PROJECT IS IN THE SEQUENCING OF THE PROJECT.

WE HAVE THREE MAIN PHASES.

THE FIRST IS WE'VE GOT TO RELOCATE ELECTRICAL POWER.

WE'VE GOT TO GET THAT MOVED OUT OF THE WAY SO WE CAN BUILD THE NEW PUMP STATION.

SO WE'VE GOT TO MOVE ELECTRICAL POWER.

AND THEN ONCE WE GET THE STUFF THAT'S IN THE WAY OUT OF THE WAY, THEN WE CAN GO INTO PHASE TWO WHERE WE'RE ACTUALLY BUILDING THE PUMP STATION.

AND THEN AFTER THE PUMP STATION IS BUILT, THEN WE CAN DEMOLISH THE OLD PUMP STATION AND THEN FINISH THE ROADS AND INSTALL THE GENERATOR.

SO THE GENERATOR IS ONE OF THE LAST THINGS THAT GETS INSTALLED.

BUT ONE OF THE THINGS WE WANT TO FRONT LOAD IS WE WANT TO FRONT LOAD THIS FENCE BECAUSE WE BELIEVE THAT'S GOING TO PROVIDE ADDITIONAL PRIVACY DURING CONSTRUCTION, MORE SO THAN THE EXISTING CHAIN LINK WITH THE PRIVACY SLATS AND SOMETHING ELSE WE'RE HAVING THE CONTRACTOR DO THAT'S IN THE PLANS IS WE'RE GOING TO HAVE A 12 FOOT SOUND BARRIER GO AROUND MOST OF THE SITE WHERE WE'RE GOING TO HAVE CONSTRUCTION ACTIVITIES AND.

RECOGNIZING MOST OF THOSE ACTIVITIES ARE GOING TO BE ON THAT NORTH END.

BUT THERE'S ALSO GOING TO BE ACTIVITIES DOWN TOWARD THOSE TANKS BECAUSE THERE IS GOING TO BE PAINTING AND BLASTING ON THOSE TANKS.

WHEN I SAY BLASTING, THAT'S NOT LIKE DYNAMITE.

THAT IS THAT'S THAT'S SAND BLASTING.

SO JUST TO CLARIFY THAT.

BUT BUT THAT IS GOING TO HAPPEN ON THOSE TWO TANKS.

SO WE'RE GOING TO PUSH THOSE 12 FOOT SOUND BARRIERS DOWN THERE AS WELL.

SO LET ME MAKE SURE I UNDERSTAND THIS RIGHT.

CURRENTLY, YOU DON'T HAVE GENERATORS ON THAT SITE, CORRECT? THERE IS A GENERATOR ON SITE.

YES. BUT YOU'RE GOING TO PUT TWO MORE INDUSTRIAL SIZED GENERATORS ON THAT SITE TO ACCOMMODATE THE CAPACITY FOR THE SITE.

CORRECT? HOW MUCH SIZE DIFFERENCE ARE WE TALKING IN THE GENERATORS? BECAUSE WHAT I'M THINKING HERE IS YOU'RE PUTTING A VERY LARGE AMOUNT OF FUEL, VERY CLOSE TO OUR HOMES.

SO THAT'S A BIT OF A CONCERN.

SO WHAT IS CURRENTLY THERE VERSUS WHAT YOU'RE PUTTING IN? SO THE SIZE THAT'S THERE AND I DON'T KNOW IF IT'LL SHOW ON THIS FIRST SLIDE.

SO THE PERPENDICULAR WIDE OBJECT ON THE RIGHT SIDE OF THAT PHOTO IS THE EXISTING GENERATOR.

AND SO YOU HAVE TO HAVE JUST ABOUT A SEMI TRUCK TO MOVE THAT.

SO THESE ARE ABOUT THE SAME SIZE.

AND SO THEY'RE THEIR UNDERWRITER LABORATORY.

I DON'T REMEMBER THE EXACT NUMBER, BUT IT'S A UL LISTED BELLY TANK.

IT'S A DOUBLE WALL TANK.

AND BECAUSE OF THAT, IT DOESN'T REQUIRE ADDITIONAL CONTAINMENT.

SO IT IS SOMETHING THAT MEETS.

THE STATE REQUIREMENT.

IT'S SOMETHING THAT MEETS FIRE MARSHAL REQUIREMENTS AS WELL.

YES, MA'AM. WHAT IS RIGHT IN BACK OF ME? IT'S A CORNER WHERE MURPHY ADJOINS WITH CUMMINGS.

THEY WERE DOING AN AWFUL LOT OF WORK ON ONE OF THOSE CEMENT THINGS THAT HAD, LIKE, A BIG GOOSENECK THAT USED TO BE A LIGHT OR SOMETHING. AND THEN THEY ENLARGED THE CEMENT PLANT AND THEY PUT ALL THE MACHINERY THERE AND THEY WERE DIGGING THERE QUITE FREQUENTLY.

WHAT IS THAT? SACHSE. AND ON THE SOUTH END.

CUMMINGS AND WHERE? MURPHY. THERE'S A CORNER LOT AND THERE'S A HOUSE HERE.

THEY'RE REDOING THAT AREA.

AND IT WAS OUT IN THE STREET.

IT WAS OUT IN THE STREET? NO. NO.

THERE'S MURPHY.

MURPHY DRIVE COMES LIKE THIS, AND THEN CUMMINGS COMES LIKE THIS.

THERE'S A CORNER HOUSE THAT'S NOT AFFECTED BY THE POST, BUT THE HOUSE ON MURPHY IS AFFECTED BY THIS THING THAT IS IN BACK OF ME DIRECTLY. IT'S A GOOSENECK THAT USED TO BE THEY HAD A WIRE AROUND THE FENCING AND ANYTIME SOMEBODY.

THE CAMERAS THAT WERE PUT IN THERE AND THE NEW LIGHTS, I'M NOT SURE I'M NOT SURE EXACTLY WHAT THAT IS, BUT WE CAN LOOK INTO THAT.

THERE WAS A LOT OF ACTION.

[00:25:01]

AND SO ONE OF THE THINGS I WOULD SAY, IF YOU SEE OUT AND WHEN Y'ALL ARE GOING BACK THROUGH THE NEIGHBORHOOD, IF YOU IF YOU SEE THOSE GOOSENECKS, THAT'S USUALLY AN INDICATION THAT THERE'S SOME SORT OF VAULT THERE FOR EITHER PIPELINE.

AIR RELIEF WAS HUGE.

IT WAS A NONEVENT.

OKAY. SO I DON'T KNOW.

I'M NOT SURE. OKAY.

I'LL TAKE A PICTURE AND SEND IT TO STUTEVILLE.

SO OVERALL, THE PROJECT GOALS FOR THIS FOR THIS PUMP STATION AND THIS IS A PRETTY SIGNIFICANT INVESTMENT FOR THE TRINITY RIVER AUTHORITY AND THEY WANT TO PROVIDE RELIABILITY FOR YOUR WATER SERVICE.

THEY WANT TO PROVIDE REDUNDANCY FOR YOUR WATER SUPPLY.

THE PROJECT WE WE MUST MAINTAIN DELIVERING WATER DURING THIS PROJECT.

SO WE HAVE TO WE HAVE TO MAINTAIN THOSE OPERATIONS WHILE WE BUILD THIS STUFF.

SO THAT'S WHY WE HAVE TO BUILD IT OFF TO THE SIDE BECAUSE THERE'S NO OTHER PLACE TO BUILD IT.

EXCUSE ME. WHAT? WHAT IS IT ABOUT BEDFORD LOCATION COMPARED TO THE OTHER FOUR CITIES THAT MADE IT? LET'S DO IT IN BEDFORD.

BACK WHEN YOU PROBABLY WERE NOT AROUND.

BACK WHEN I WAS NOT AROUND.

I WAS NOT EITHER WAY. HOW DID THEY DECIDE? HOW DID THEY DECIDE ON THE WATER PLAN THAT THIS IS A PLACE.

BUT IT'S REALLY COMPLICATED.

THAT IS ONE OF THE THINGS. I MEAN, IF YOU GO BACK TO THAT EARLIER SLIDE WHERE YOU HAVE NORTH RICHLAND HILLS, COLLIERVILLE, EULESS, GRAPEVINE, I MEAN, IT'S THERE IN THE MIDDLE. SO IT'S A PLACE WHERE YOU CAN YOU CAN PICK UP THAT WATER AND PUSH IT OUT.

YOU CAN GIVE IT TO BEDFORD.

YOU CAN GIVE IT TO EVERYONE ELSE.

OF THE QUESTION HOW LONG DO YOU EXPECT? SO THE DURATION.

SO THE DURATION IS DRIVEN BY A COUPLE OF THINGS.

SO THOSE KIND OF CRITICAL PATH ITEMS. ONE IS WE'VE GOT TO GET THE UTILITIES OUT OF THE WAY AND THEN THEY CAN START WORKING ON THE PUMP STATION.

BUT ANOTHER THING IS THIS THIS ELECTRICAL GEAR, JUST FROM THE TIME WE SAY, YES, THAT'S THE ELECTRICAL GEAR, WE AGREE THAT MEETS THE REQUIREMENTS BECAUSE IT'S IT'S NOT CHEAP AND THEY CAN'T JUST GO GET IT.

IT THAT TAKES ABOUT 80 TO 96 WEEKS JUST FOR THEM TO BUILD IT.

AND THAT'S BEFORE IT EVEN SHOWS UP ON SITE.

SO DURING THAT, THERE'S SOME CONCURRENT ACTIVITIES THAT CAN HAPPEN WHERE THEY'RE STARTING TO INSTALL THE PUMP STATION, THE CANS AND GET THE SHELL OF THE BUILDING.

SO IDEALLY WE HAVE THE SHELL OF THE BUILDING COMPLETE BEFORE ALL THAT GEAR IS FABRICATED AND THEN IT'S ALL THEY HAVE TO DO IS BRING IT IN AND DROP IT IN AND INSTALL IT.

SO WE WE ANTICIPATE THE TOTAL DURATION BEING AROUND 30 MONTHS BECAUSE OF THOSE, BECAUSE WE.

BECAUSE WE END UP WE BUILD THE NEW ONE AND THEN WE AND THAT'S WHEN WE'RE ALLOWED TO TEAR DOWN THE OLD ONE.

ARE YOU GOING TO HAVE ANY TYPE OF TIME REQUIREMENT? LIKE AT ONE POINT IN THAT SITE THEY THEY WILL BRING IN CHECKS IN AT.

YES, THE PUMP STATION WAS OPEN AND THEY JUST SIT ON IT FOR LIKE SEVERAL HOURS.

SO YOU WAIT. I GET WOKE UP AT 530 BY THE TRUCK SHOWING UP AND THEN.

WHAT'S YOUR ANSWER? THIS IS ON MURPHY OR CUMMINGS.

OR ON MURPHY. MURPHY.

SO. SO I'D SAY THIS FEEDS RIGHT INTO THAT VERY LAST BULLET.

TRYING TO BE A GOOD NEIGHBOR.

THE AUTHORITY WANTS TO BE A GOOD NEIGHBOR.

THEY WANT THIS THING TO BE THEY WANT QUALITY TO BE PUT IN AND THEY WANT IT TO LAST FOR SEVERAL DECADES.

SO SO THAT'S ASIDE FROM YOUR QUESTION, BUT THEY WANT TO BE A GOOD NEIGHBOR IN DOING THAT.

SO WE DO HAVE TIME RESTRICTIONS IN THERE.

AND THEN WE'VE ALSO PUT IN TO THE ON THE GENERAL NOTES.

SO BEHIND THE COVER SHEET OF THE PLANS, WE SAY COMPLY WITH CITY OF BEDFORD NOISE ORDINANCES.

AND SO THAT'S THAT'S HOW WE HOLD THEM ACCOUNTABLE.

THERE IS WE TELL THEM YOU NEED TO COMPLY WITH THE CITY'S NOISE ORDINANCE.

AND I'D LIKE TO ADD THAT WE WILL HAVE STAFF ON SITE EVERY DAY.

EVERY. OF THE WORKERS.

SO THAT'S PART OF WHAT MY STAFF DOES, IS ENFORCE THOSE THOSE ITEMS. SO IF WE HAVE ISSUES WITH IT, LIKE WE WON'T HAVE PARKING ON YOUR STREETS OF CONSTRUCTION WORKERS, THAT THAT WON'T BE ALLOWED.

SO LIKE CHARLIE SAID, THE GOOD NEIGHBOR ASPECT.

BUT IF OCCASIONALLY THINGS SLIP THROUGH THE CRACKS, WE WANT TO HEAR ABOUT IT.

IT WAS LIKE EVERY DAY.

YEAH, THAT I WOULD AGREE IT WAS NOT OCCASIONALLY.

YEAH. IF WE IF WE KNOW, THEN WE WE WOULD DO SOMETHING ABOUT IT FOR SURE.

SO WE'LL, WE'LL, WE'LL MAKE SURE THAT WE.

YOUR CONCERN IS NOTED.

YES, MA'AM. A COUPLE OF QUESTIONS.

THE MAIN QUESTION IS THE NEW PUMP HOUSE.

THAT'S UP AGAINST THE.

WEST. HENCE.

HOW LOUD WILL THAT BE? IS THAT GOING TO AFFECT YOU? THAT'S A GREAT QUESTION. SO MY NEIGHBORHOOD AND THEN SECOND QUESTION, THE EMERGENCY ROOM THAT RUNS TO THE WEST OF THE TANKS

[00:30:05]

THAT YOU SAID WERE GOING TO BE GRAVEL ROAD THAT GOES OUT.

THERE'S A GATE GOING OUT.

THAT EXIT USED TO BE A VERY NICE CONCRETE DRIVEWAY UNTIL THEY STARTED DOING THE RECONSTRUCTION.

REFURBISHING THE TANK IS COMPLETELY GONE, TORN OUT BETWEEN THOSE TWO HOUSES.

THEY'VE BEEN PROMISED IT WOULD BE REFINISHED INTO A CONCRETE DRIVEWAY AND HAVE NOT HEARD THAT.

SO WE'RE GOING TO HAVE A CONCRETE APPROACH THAT TURNS INTO GRAVEL.

SO IT'LL IT'LL BE.

YES, YES, YES, MA'AM.

OKAY. SO AND SO SO YOUR FIRST QUESTION ON SO THE FIRST QUESTION ON THE NOISE WITHIN THE PUMP STATION.

SO A COUPLE OF BEST PRACTICES AND JUST PUMP STATION DESIGN IS WHEN YOU'RE SIZING YOUR PIPING INSIDE YOU SIZE IT SO YOU REDUCE THE VELOCITIES BECAUSE WITH THE HIGHER VELOCITIES, IT'S NOISIER.

SO THAT'S ONE OF THE THINGS WE'VE DONE IS WE'VE WE'VE GOT SOME BIGGER PIPING IN THERE, BIGGER VALVES THAN TYPICAL BECAUSE WE WANT TO REDUCE THAT NOISE, REDUCE THAT VELOCITY. PARDON ME.

ANOTHER THING IS WE'VE GOT SOME SOUND ATTENUATING PANELS THAT WE'RE PUTTING INSIDE OF THE BUILDING AND WE'RE DOING THAT INSIDE OF THE ELECTRICAL ROOM AS WELL, BECAUSE THE ELECTRICAL ROOM, THOSE DRIVES, THEY HAVE SOME FANS ON TOP OF THE DRIVE.

SO WE'VE GOT SOUND ATTENUATING PANELS THAT WILL BE IN BOTH AND THEN.

SOMETHING ELSE IS THAT THE MOTORS THAT ARE THAT ARE SITTING ON TOP OF THE PUMPS.

WE HAVE A WE HAVE A DECIMAL REQUIREMENT WITHIN I DON'T REMEMBER THE EXACT SPECIFICATION, BUT IT'S MEANT THAT YOU CAN STAND BESIDE IT AND CARRY ON A CONVERSATION. THEY DIDN'T FOLLOW THAT THIS LAST TIME FOR SURE.

THE NOISE WAS HORRENDOUS ON THE REFURBISHING.

YEAH. OH, YEAH.

TWO MORE COMING. HOW MANY MORE? THIS. THIS WAS THE LAST SLIDE.

YEAH, I JUST WANT TO, AS A POINT OF REFERENCE, THIS WAS A PRESENTATION MADE TO PLANNING AND ZONING COMMISSION FOR THE PUBLIC'S BENEFIT.

THE IDEA WAS NOT TO TAKE QUESTIONS IN THE PUBLIC SETTING.

HOWEVER, I KNOW THAT OFFICIALS ARE HERE AND PNC DOES HAVE A SCHEDULED MEETING TO FOLLOW UP.

WE THOUGHT THIS WOULD GO OVER A LITTLE BIT AND THAT'S FINE THAT WE COULD GO OVER A LITTLE BIT.

BUT I JUST WANT TO MAKE SURE PNC HAS ALL THEIR QUESTIONS ANSWERED AND THEN AFTER TRA REPRESENTATIVE WILL BE AVAILABLE TO ANSWER ANY QUESTIONS TO THE GENERAL PUBLIC.

GOOD. CAN WE GET A HOLD OF THIS PRESENTATION? HE GAVE US AN EMAIL OR PAPER OR WHATEVER.

EITHER WAY, WE CAN GET THAT TOO, IF IT'S OKAY WITH Y'ALL, I THINK.

YES, WE HAVE IT. THE CITY WILL MAKE IT PUBLIC TO EVERYBODY.

OKAY, GREAT. THINGS WILL BE HANDLED DIRECTLY TO TARA.

OR DIRECTLY TO THE CITY.

IF IT'S A NOISE COMPLAINT OR SOMETHING GOING ON.

EITHER IS FINE. YOU CAN CONTACT NEIGHBORHOOD SERVICES.

YOU CAN FILE A COMPLAINT ONLINE THROUGH THE NORMAL SYSTEM.

OR IF YOU HAVE DIRECT INFORMATION, CONTACT THEM.

BUT WE'RE IN CONSTANT CONTACT, SO.

FINE. THANK YOU. YES, SIR.

A COUPLE OF QUICK QUESTIONS BEFORE WE WRAP IT UP HERE.

THE NEW ELECTRICAL STUFF, WE BOUGHT UP TO THAT.

SO WE'LL BE NOW NEIGHBORS WITH YOU GUYS WHERE WE WEREN'T BEFORE.

HOW TALL ARE THOSE? FIRST QUESTION. SECOND QUESTION, WHAT'S THE PLAN FOR ALL THE TREES THAT EXIST BECAUSE IT DIDN'T SHOW THEM ON THE.

SO THOSE TREES WILL COME DOWN? YEAH, THOSE TREES NEED TO COME DOWN AND THERE'S NO PLACE ELSE.

I MEAN, WHAT WAS THE PLAN TO DO IF YOU DIDN'T BUY THAT PIECE OF PROPERTY? RIGHT. LIKE, I MEAN, THERE'S NOTHING WE CAN DO, RIGHT? THE PLAN WAS CONTINGENT ON HAVING THAT FOR THE ELECTRICAL BECAUSE WE NEED TO GET THE ELECTRICAL OUT OF THE WAY.

SO YOU'RE GOING TO CLEAR CUT THAT WHOLE LOT.

THAT'S NOT BEING A GOOD NEIGHBOR.

YEAH, THAT'S NOT. HOW MUCH NOISE ARE THEY GOING TO MAKE? BECAUSE I. BUT I'M RIGHT BEHIND THAT.

THAT BOX RIGHT NEXT TO MY HOUSE.

JUST. JUST AS A REMINDER, WE'VE HAD A NOTE FROM STAFF.

IS IT THESE ARE ALL GREAT QUESTIONS.

AND I KNOW HOW MUCH YOU'RE CONCERNED ABOUT BEING NEIGHBORS, BUT I THINK THESE ARE THINGS THAT WE CAN TAKE OFFLINE NOW.

PLANNING AND ZONING THOUGHT THAT TO FACILITATE THE QUESTIONS THAT CAME UP IN OUR MEETING LAST MONTH, THAT TO MAKE THIS FORUM AVAILABLE TO THE RESIDENTS AFTER YOUR QUESTIONS BEFORE US IS WHY TREY IS HERE.

SO TO CONTINUE THAT DIALOG, OBVIOUSLY THERE'S SOME TIME INVOLVED AND FOR ALL THIS STUFF HAPPENS, BUT WE'D LIKE TO, YOU KNOW, RESPECTFULLY ASK THAT YOU TAKE ALL THOSE OTHER ISSUES AND QUESTIONS AND WHAT IFS OFF SITE AND DIRECTLY WITH TREY.

AND LET ME ADD VANESSA JOSEPH IS A.

SHE'S RIGHT HERE.

IF YOU HAVE QUESTIONS, I WOULD DIRECT THEM TO HER SO THAT WE CAN THOROUGHLY ANSWER THEM PROPERLY.

THANK YOU ALL FOR BEING HERE.

THANK YOU FOR YOUR INTEREST.

THANK YOU FOR YOUR TIME.

606 WILL CLOSE THE PRESENTATION.

THANK YOU VERY MUCH.

* This transcript was compiled from uncorrected Closed Captioning.