BEAR WITH ME. THAT'S GOOD.ALL RIGHT. GOOD EVENING. THE JANUARY 18TH MEETING OF THE STREET IMPROVEMENT ECONOMIC
[4B Street Improvement/Economic Development Corporation Meeting]
DEVELOPMENT CORPORATION IS CALLED TO ORDER AT 6:05 P.M.SO LET'S START DOWN THROUGH, THE FIRST ITEM IS THE APPROVAL OF THE MINUTES OF THE JULY 20TH 2021 MEETING.
I MAKE A MOTION TO APPROVE THE MINUTES.
I SECOND, I SECOND THAT MOTION.
ALL RIGHT, LET'S SEE IF WE CAN DO THIS RATE THROUGH THE REST OF IT.
I LOVE IT. OK, MOVING ON NOW TO NEW BUSINESS ITEM TWO RECEIVING THE 4B FINANCIAL STATUS REPORT AS OF DECEMBER 31, 2021.
YES. YOU CAN HEAR ME NOW? YEAH. OK. I JUST WANT TO BE SURE.
TONIGHT I WILL SHARE WITH YOU OUR 4B FINANCIAL STATUS REPORT FOR THE QUARTER ENDING DECEMBER 31ST, 2021.
OUR SALES TAX THAT WE'VE COLLECTED AS OF DECEMBER 2021 ARE CURRENTLY RUNNING ABOUT 18.2 PERCENT HIGHER THAN SALES TAX COLLECTIONS FOR THE PREVIOUS YEAR.
THAT EQUATES TO ABOUT ONE HUNDRED AND FORTY ONE THOUSAND FIVE HUNDRED AND SEVENTY FOUR DOLLARS HIGHER THAN THE SAME TIME LAST YEAR.
TO DATE OR I SHOULD SAY, AS OF DECEMBER 31ST, 2021, WE'D ACTUALLY COLLECTED NINE HUNDRED AND NINETEEN THOUSAND FOUR HUNDRED AND SEVENTY NINE DOLLARS IN SALES TAX REVENUE COMPARED TO THE PREVIOUS YEAR, WHERE WE COLLECTED SEVEN HUNDRED AND SEVENTY THOUSAND NINE HUNDRED AND FIVE DOLLARS IN SALES TAX REVENUE.
AS FOR TOLL REVENUES, WE'VE ACTUALLY COLLECTED NINE HUNDRED AND TWENTY ONE THOUSAND FOUR HUNDRED AND FIFTY SEVEN DOLLARS IN TOTAL REVENUES.
THAT'S ABOUT 27.8 PERCENT OF OUR $3.3 MILLION BUDGET.
NORMALLY FOR THAT FIRST QUARTER, WE WOULD ANTICIPATE BEING AT ABOUT TWENTY FIVE PERCENT OF BUDGET. SO THE FACT THAT WE'RE AT TWENTY SEVEN PERCENT, WE'RE A LITTLE BIT HIGHER THAN BUDGETED, AND THAT'S A REALLY GOOD THING.
YOU CAN SEE IN THAT REPORT THAT YOU'RE LOOKING AT THAT OUR INTEREST EARNINGS ARE DOWN ABOUT 15 PERCENT.
DURING THE FIRST COUNCIL MEETING IN JANUARY, THERE WAS AN INVESTMENT REPORT PRESENTED TO YOU, AND IN THAT REPORT YOU CAN SEE THE TOTAL PORTFOLIO YIELD FOR THE CITY.
WE'RE YIELDING ABOUT THIRTY SIX BASIS POINTS OVERALL, AND THAT'S REALLY THAT'S UNFORTUNATE AND REALLY LOW.
AND JUST TO GIVE YOU AN IDEA OF WHAT THAT MEANS, WE HAVE A PORTFOLIO OF ABOUT $10 MILLION. WE'VE GOT $6 MILLION IN BOND MONEY THAT WE ISSUED IN 2021 FOR THE NEW STREETS AND THOROUGHFARES THAT WE'RE GOING TO BE WORKING ON FOR THE NEXT FIVE YEARS.
WE ALSO HAVE ABOUT 3.5 MILLION IN OPERATION BONDS, SO THAT'S ABOUT 10 MILLION DOLLARS IN THE 4B PORTFOLIO.
CURRENTLY, THAT PORTFOLIO BASED ON THAT THIRTY SIX BASIS POINTS I JUST REFERRED TO, IT'S EARNING ABOUT THIRTY SIX THOUSAND PER YEAR ON TEN MILLION DOLLARS LAST YEAR, THIS TIME BASED ON THE YIELD OF 1.07 PERCENT.
THAT SAME PORTFOLIO WOULD HAVE BEEN EARNING ONE HUNDRED AND SEVEN THOUSAND.
SO THAT KIND OF GIVES YOU AN IDEA OF HOW HOW LOW OUR YIELDS ARE RIGHT NOW.
AND THAT AGAIN, BASED ON PUBLIC FINANCE INVESTMENT ACT AND HOW WE CAN INVEST THOSE FUNDS, WE REALLY HAVE VERY LIMITED, INVESTMENTS THAT WE CAN DO WITH THOSE FUNDS.
MOVING ON TO OUR EXPENDITURES AS OF DECEMBER 31ST, WE'VE ACTUALLY SPENT ABOUT TWO HUNDRED AND THIRTEEN THOUSAND THREE HUNDRED AND FIFTY ONE DOLLARS.
THIS REFLECTS 7.3 PERCENT OF OUR 2.9 MILLION DOLLARS BUDGET.
SO OUR EXPENDITURES ARE WAY OR THAT SOUNDS REALLY LOW.
HOWEVER, WE'RE ACTUALLY UP FORTY EIGHT PERCENT FROM WHERE WE WERE LAST YEAR.
WE'RE UP ABOUT SIXTY NINE THOUSAND DOLLARS AS FOR EXPENDITURES.
WE ACTUALLY BOUGHT SOME CONTRACTS TO YOU ALL EARLIER THIS YEAR, THE PUBLIC WORKS DEPARTMENT GOT STARTED ON THEIR CONCRETE CONTRACT AND THEIR PAYMENT CONTRACT, SO SOME OF THOSE EXPENDITURES ARE OFF TO AN EARLIER START THAN WHAT THEY HAVE BEEN IN THAT FIRST QUARTER. SO THAT'S WHAT'S DRIVING THAT INCREASE IN EXPENDITURES FOR THE FIRST QUARTER.
THE SECOND QUARTER, YOU'LL SEE A PICKUP OF EXPENDITURES, BUT NORMALLY THE FIRST QUARTER IS PRETTY LOW. THAT'S JUST A NORMAL TREND FOR THAT QUARTER OVERALL AS OF THE END OF THE QUARTER. OUR REVENUES ARE EXCEEDING EXPENDITURES BY APPROXIMATELY SEVEN HUNDRED AND EIGHT THOUSAND. WE ACTUALLY BUDGETED A FUND BALANCE OF APPROXIMATELY 3.9 MILLION.
OUR PUBLIC WORKS DIRECTOR IS ABOUT TO BRING TO YOU A BUDGET AMENDMENT SHORTLY ON THE NEXT COUPLE OF AGENDA ITEMS THAT THAT AMENDMENT, IF IT'S APPROVED, WILL ALLOW US TO IMPLEMENT
[00:05:02]
SOME IMPROVEMENTS TO OUR RESIDENTIAL STREETS FOR ABOUT 1.5 MILLION THAT WILL BASED ON THAT BUDGET AMENDMENT, THAT'LL TAKE OUR FUND BALANCE FOR THE YEAR DOWN TO ABOUT 2.4 MILLION, WHICH WILL STILL LEAVE US AT A 53 PERCENT FUND BALANCE, WHICH IS REALLY HEALTHY FOR THIS FUND. THAT PRETTY MUCH CONCLUDES OUR FINANCIAL STATUS REPORT.I'LL BE HAPPY TO ANSWER ANY QUESTIONS FOR YOU AT THIS TIME.
QUESTIONS? COMMENTS? YES, SIR, I'VE GOT A QUESTION OR TWO.
SO WHEN WE WERE DOING THE THE BUDGET, THE 4B BUDGET, WHAT WAS THE WHAT WERE YOU ESTIMATING WAS GOING TO BE THE INCREASE IN THE SALES TAX REVENUE PERCENTAGE WISE? ACTUALLY, AT HEARING, I THINK IT'S ABOUT 15 PERCENT.
SO YOU'RE ESTIMATING AT THE END OF THE YEAR, WE'RE GOING TO HAVE A 15 PERCENT INCREASE.
CORRECT. YOU'RE REFERRING TO 2022? YES, MA'AM. OKAY.
ALL RIGHT. THANK YOU. AND RIGHT NOW, WHEN YOU LOOK AT JANUARY MAYOR, SINCE YOU ASKED THAT QUESTION, JANUARY WAS UP TWENTY FIVE PERCENT.
IF YOU PROJECT THAT OUT FOR THE REMAINING OF THE YEAR, IF ASSUMING THAT WE HAD NO OTHER INCREASES IN ANY OTHER MONTH, WE WOULD STILL IN THE YEAR WORST CASE SCENARIO, 6.13 PERCENT HIGHER THAN.
YEAH. SO WHEN YOU SAY JANUARY, WE'RE REALLY TALKING ABOUT NOVEMBER SALES.
NOVEMBER SALES ARE REFLECTED IN JANUARY RECEIPTS.
ANY OTHER QUESTIONS OR COMMENTS.
HEARING NONE. MARIA, THANK YOU.
ALL RIGHT, THANK YOU ALL VERY MUCH.
LET'S MOVE ON TO AGENDA ITEM NUMBER THREE THE STAFF REPORT ON THE STRATEGIC PLAN YEAR ONE. CHERYL, I THINK YOU HAVE THAT ONE.
OK, IF YOU DON'T MIND, I'D LIKE TO DO THE NEXT THREE ITEMS IN THIS ALTOGETHER.
GOOD EVENING BOARD. THANK YOU FOR ALLOWING US TO TAKE THESE THREE ITEMS TOGETHER.
SO HERE'S OUR PRESENTATION OUTLINE FOR THE EVENING, WE'RE GOING TO REVIEW THE YEAR ONE PROJECTS IN THE FIVE YEAR STRATEGIC PLAN.
THEN WE'RE GOING TO MOVE TO THE YEAR TWO PROJECTS THAT ARE PLANNED FOR THIS CURRENT FISCAL YEAR. WE'RE ROLL RIGHT INTO THE BUDGET AMENDMENT AND THEN I'LL GIVE YOU AN UPDATE ON SOME FUTURE PROJECTS THAT ARE COMING UP IN THE AREA.
HERE'S A MAP SHOWING THE YEAR ONE PROJECTS IN THE FIVE YEAR STRATEGIC PLAN, IF YOU'LL NOTICE FROM THE MAP, THE PROJECTS ARE ALL OVER THE CITY.
SO WE'LL START WITH THE YEAR ONE THOROUGHFARES.
YEAR ONE THOROUGHFARES INCLUDE FOREST RIDGE DRIVE FROM [INAUDIBLE] ROAD TO HARWOOD ROAD AND FROM BEDFORD ROAD TO STATE HIGHWAY 183.
THE SECTION FROM HARWOOD TO BEDFORD ROAD WAS INTENTIONALLY POSTPONED TO ALLOW FOR THE INSTALLATION OF THE WATERLINE, WHICH IS CURRENTLY UNDER CONSTRUCTION TODAY.
TARRANT COUNTY HAS GRACIOUSLY AGREED TO PAVE THAT REMAINDER OF FOREST RIDGE THIS FISCAL YEAR THE COMPLETION OF THE WATER LINE.
ELDON DODSON BETWEEN FOREST RIDGE AND CENTRAL DRIVE WAS ALSO COMPLETED WITH THE COUNTY IN YEAR ONE. OUR PARTNERSHIP WITH PRECINCT THREE PROVIDES A SAVINGS TO THE CITY COMPARED WITH CONTRACTOR PRICING.
TARRANT COUNTY PAVED APPROXIMATELY 10000 LINEAR FOOT LINEAR FEET OF THOROUGHFARES FOR THE CITY OF BEDFORD LAST YEAR.
PHOTOS ON THE LEFT ARE A FOREST RIDGE DRIVE AND THE PHOTOS ON THE RIGHT ARE OF ELDON DODSON. YEAR ONE RESIDENTIAL STREETS, PLUS THE CARRYOVER STREETS THAT WERE NOT COMPLETED PREVIOUSLY, TOTAL 13000 LINEAR FEET THAT RECEIVED EITHER A MILL IN OVERLAY OR FULL DEPTH RECLAMATION LAST YEAR.
IF YOU'LL RECALL, THE BOARD AND THE CITY COUNCIL APPROVED THE FIVE YEAR STRATEGIC PLAN IN JUNE AND THE FISCAL YEAR ENDED SEPTEMBER 30TH.
SO YEAR ONE FIVE YEAR STRATEGIC PLAN WAS TRULY AGGRESSIVE IN NEARLY ALL OF THE IDENTIFIED STREETS WERE COMPLETED WITHIN ABOUT TWO TO THREE MONTHS.
WE'RE PRETTY PLEASED WITH THE NUMBER OF STREETS THAT WERE COMPLETED, AS WELL AS THE QUALITY OF THE WORK, AND HERE ARE SOME PHOTOGRAPHS OF THOSE GOOD LOOKING STREETS.
CAN I ASK A QUESTION? YES, MA'AM. [INAUDIBLE] OK.
IT TOOK SEVERAL YEARS TO DO IT, DIDN'T IT? THAT WAS ONE OF THE ONES ON THE PREVIOUS LIST.
I DON'T KNOW THE REASON WHY IT WASN'T PAVED PREVIOUSLY, BUT WE CARRIED OVER THE LIST OF PROBABLY A HANDFUL OF STREETS AND WE WENT AHEAD AND DID THEM LAST FISCAL YEAR.
SO WHEN I WAS OVER THERE AND IT WAS REALLY ROUGH FOR A PERIOD OF TIME AND THEN THEY WENT BACK AND FINISHED IT.
IS THAT WHAT HAPPENED? BECAUSE WERE YOU THERE DURING THE CONSTRUCTION OF IT? YEAH, BUT THAT WAS TWO YEARS AGO.
THERE WAS A BUNCH OF CONSTRUCTION UNDER THAT.
I DON'T KNOW WHAT HAPPENED TWO YEARS AGO.
[INAUDIBLE] WAS DOOR OF THE STREET THAT HAD THE THE DEAL IN THE MIDDLE.
NO, IT WAS LIKE IT WAS LIKE A FOOTBALL FIELD, IT WAS KIND OF CONCAVE AS A STREET.
[00:10:04]
WAS THAT THE STREET THAT WE HAD THAT? I DON'T I DON'T BELIEVE SO.WE HAVE ONE STREET THAT WE HAD TO GO SEVERAL YEARS AGO THAT IT WAS, I DON'T EVEN KNOW HOW TO DESCRIBE IT. IT WAS LIKE BOLD IN THE YEAH, THE CROWN OF THE STREET WAS PRETTY SEVERE.
I DON'T RECALL THIS ONE HAVING.
OK, SO IT MUST HAVE BEEN A DIFFERENT STREET THAN.
YEAH, THIS ONE WAS I THOUGHT THIS ONE WAS PRETTY FLAT.
OKAY. JUST LIKE THAT PROJECT'S BEEN GOING ON QUITE A LONG TIME.
WELL, I KNOW THIS IS JUST A PORTION OF DORA.
NO, WE DIDN'T DO THE WHOLE THING.
OK. SO AS I MENTIONED, THE FIVE YEAR CIP WAS PRETTY AGGRESSIVE.
THE BOARD APPROVED THE PLAN IN 15 IN.
EXCUSE ME, ON JUNE 15TH, THE COUNCIL APPROVED IT JUNE 22ND AND THE END OF THE FISCAL YEAR WITH SEPTEMBER 30TH, SO THESE STREETS WERE COMPLETED IN TWO TO THREE MONTHS AND THIS IS HOW WE ENDED FISCAL YEAR '21 '22.
WE BLOW IT UP A LITTLE. YOU'LL NOTICE ON THE ON THE LIST THERE THAT WOODVILLE AND LEE WERE BOTH. NEITHER OF THOSE WERE COMPLETE WERE ABLE TO BE COMPLETED LAST YEAR.
WE JUST RAN OUT OF FISCAL YEAR BECAUSE EVERYTHING WAS APPROVED SO LATE IN THE FISCAL YEAR, SO WE'LL MOVE THOSE OVER TO THIS FISCAL YEAR TO GET DONE.
SO, IN ADDITION TO STREETS PUBLIC WORKS AS RESPONSIBLE FOR MAINTENANCE AND REPAIR OF SIDEWALKS THROUGHOUT THE CITY SIDEWALK PROGRAM AND BEDFORD'S EXTENSIVE BUT THE CONCRETE BUDGET OF FOUR HUNDRED AND FIFTY THOUSAND LAST FISCAL YEAR, SOME OF LAST YEAR'S SIDEWALK REPAIR REQUESTS DATED BACK TO 2013.
ADDITIONALLY, COMMUNICATIONS STAFF PROMOTED THE PROGRAM TO THE PUBLIC LAST YEAR WITH A LINK ON THE WEBSITE TO ALLOW PROPERTY OWNERS TO SUBMIT REQUESTS ONLINE SO THAT LIST CONTINUES TO GROW.
OOPS! IN ADDITION TO REPAIRS, AN AMENDMENT WAS APPROVED TO INSTALL 1900 LINEAR FEET OF NEW SIDEWALKS ALONG SHADY BROOK DRIVE.
THESE SIDEWALKS WERE REQUESTED AND A PETITION WAS SIGNED BY 100 PERCENT OF THE PROPERTY OWNERS ALONG THE ROUTE.
THE EFFORT INVOLVED WORKING CLOSELY WITH PROPERTY OWNERS THAT WEREN'T REAL CLEAR ON THE IMPACTS OF THE TO THEIR PROPERTY, INCLUDING MAJOR RELOCATIONS, RETAINING WALLS ALONG THE FRONT OF THE YARDS AND POTENTIAL MODIFICATIONS TO THE DRIVEWAYS.
THE SHADY BROOK DRIVE SIDEWALK WAS COMPLETED IN APPROXIMATELY ONE MONTH, INCLUDING YARD RESTORATION PRIOR TO THE BEGINNING OF THE SCHOOL YEAR.
ANOTHER MOBILITY IMPROVEMENT IS A STRETCH OF NEW SIDEWALKS ADDED TO THE NORTH AND SOUTH SIDES OF BEDFORD ROAD, EAST OF STATE HIGHWAY 121.
THESE SIDEWALKS LINK THE RESIDENTIAL NEIGHBORHOODS TO TRINITY HIGH SCHOOL TO ALLOW FOR SAFER ROUTES TO SCHOOL.
CITIES CRACK SEAL, EXCUSE ME, THE CITY'S STREET PROGRAM INCLUDES PREVENTATIVE MAINTENANCE, WHICH IS CURRENTLY ONLY CRACK SEAL AT THIS TIME, A TOTAL OF NEARLY 47000 CENTERLINE FEET OF STREETS RECEIVED CRACK SEAL LAST YEAR.
AGAIN, THIS IS THAT MAP SHOWING THOSE YEAR ONE PROJECTS.
THE NEXT ITEM ON THE AGENDA IS A STATUS UPDATE ON THE YEAR TWO PROJECTS, WHICH INCLUDES THOROUGHFARES, RESIDENTIAL STREETS, AND PREVENTIVE MAINTENANCE.
HERE'S A MAP SHOWING AT THE OVERALL YEAR, TWO PROJECTS FOR THIS FISCAL YEAR.
IN PARTNERSHIP WITH TARRANT COUNTY PRECINCT THREE, FOREST RIDGE DRIVE WILL RECEIVE A MILL IN OVERLAY BETWEEN HARWOOD AND BRETT IN BEDFORD ROAD.
THE WATER LINE PROJECT ON FORREST RIDGE IS ANTICIPATED TO BE COMPLETE IN COMING MONTHS.
AND IF YOU RECALL, TARRANT COUNTY PAVED FOREST RIDGE FROM [INAUDIBLE] TO STATE HIGHWAY 183 IN YEAR ONE.
SO THIS SECTION WAS LEFT OUT AND DUE TO THE IMPENDING WATER LINE CONSTRUCTION AND BY THIS BY THIS SUMMER, ALL OF FOREST RIDGE DRIVE WILL HAVE RECEIVED NEW PAVING WITHIN THE PAST COUPLE OF YEARS. ALL THE WAY FROM CHEEKS PARKER DOWN TO PIPELINE ROAD.
STAFF IS EXCITED TO ANNOUNCE THAT TARRANT COUNTY HAS ALSO AGREED TO MILL AN OVERLAY HARWOOD ROAD THIS FISCAL YEAR FROM THE WEST CITY LIMITS TO OAK VALLEY DRIVE AT THE COMPLETION OF THE WATER LINE PROJECT.
THE PARTNERSHIP WITH TARRANT COUNTY IS EXTREMELY BENEFICIAL TO THE CITY AND THAT THEY PROVIDE THE LABOR AND THE CITY PROVIDES THE TRAFFIC CONTROL AND MATERIALS WHICH RESULTS IN A SAVINGS TO THE CITY VERSUS AS IF WE HAD TO HIRE A CONTRACTOR DUE TO THE WORK, CONTRACTOR TO DO THAT WORK.
AS A SIDE NOTE, BOTH MAJOR THOROUGHFARES ARE PLANNED TO BE REHABILITATED IN TIME FOR THE OPENING OF GENERATIONS PARK, WHICH IS SET FOR LATER ON THIS YEAR.
THIS TABLE SHOWS THE FIVE YEAR PLAN FOR THOROUGHFARES THAT WAS APPROVED LAST YEAR, AND WE'RE EXCITED TO SAY THAT WE'RE ABLE TO MOVE HARWOOD ROAD UP ONE FISCAL YEAR.
HERE WE HAVE THE RESIDENTIAL STREETS PLAN FOR YEAR TWO.
LEE STREET WAS ON LAST YEAR'S LIST, BUT DUE TO UTILITY ISSUES, IT HAD TO BE POSTPONED UNTIL THIS YEAR. ALSO INCLUDED WAS WOODVILLE.
UNFORTUNATELY, TIMING IN THE END OF THE FISCAL YEAR PREVENTED COMPLETION OF THOSE STREETS. WOODVILLE WILL RECEIVE A FULL DEPTH RECLAMATION ON THE FAR WEST SEGMENT AND THE REMAINDER OF WOODVILLE IS A GOOD CANDIDATE FOR A STREET THAT COULD BENEFIT FROM A PAVEMENT PRESERVATION APPLICATION TO PROLONG ITS USEFUL LIFE.
[00:15:01]
THE BOARD'S OPERATING BUDGET FOR THE CURRENT FISCAL YEAR DID NOT INCLUDE A LINE ITEM FOR ANY ASPHALT. AS SUCH, THE BUDGET AMENDMENT BEFORE YOU THIS EVENING INCLUDES SIX HUNDRED THOUSAND DOLLARS FOR THE ASPHALT CONTRACT REQUIRED TO PAVE THESE RESIDENTIAL STREETS, AS WE DID IN YEAR ONE AN INNER LOCAL AGREEMENT WITH REYNOLDS ASPHALT WILL BE PLACED ON A COUNCIL AGENDA CONTINGENT UPON APPROVAL OF THE BUDGET AMENDMENT.WALTER STREET IS ALSO SHOWN ON THE RIGHT TOP RIGHT.
IT'S PARTIALLY FUNDED THROUGH THE TARRANT COUNTY COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM. THE CITY'S CONTRIBUTION IS ALSO INCLUDED IN THAT BUDGET AMENDMENT FOR WALTER STREET. THE PROJECT IS CURRENTLY UNDER DESIGN AND IS ANTICIPATED TO GO TO CONSTRUCTION THIS SPRING. AS PART OF THE CITY'S EFFORTS TO MAINTAIN GOOD PAVEMENT IN GOOD CONDITION AND TO EXTEND THE TAX DOLLAR INVESTMENT STREETS AND THOROUGHFARES THAT HAVE BEEN MILL AND OVERLAID PREVIOUSLY WERE FIELD INSPECTED TO IDENTIFIED AREAS WHERE SURFACE CRACKS MAY HAVE FORMED. SEALING OF THE CRACKS PREVENTS WATER INTRUSION THAT WILL REDUCE USEFUL LIFE TO THE PAVEMENT. AND THESE ARE THE STREETS THAT ARE PLANNED FOR CRACK SEALING THIS YEAR.
THAT CONTRACTOR BEGAN WORK IN JANUARY AND SHOULD BE COMPLETED PROBABLY BY THE END OF THIS WEEK. YOU'LL RECALL THE SLIDE FROM LAST YEAR'S JUNE PRESENTATION, THIS WAS THE STRATEGIC PLAN THAT WAS APPROVED BY THE BOARD AND THE CITY COUNCIL.
THE SHORT TERM GOALS WERE ACHIEVED IN YEAR ONE AND THE LONG TERM LONG TERM GOALS INCLUDE A NEW STREET ASSESSMENT TO RECALIBRATE FUTURE STRATEGIC PLAN YEARS.
INITIALLY, WE RECOMMENDED HOLDING OFF ON IT UNTIL NEXT FISCAL YEAR.
WE WOULD LIKE TO MOVE THAT UP TO THIS FISCAL YEAR TO GIVE US FRESH DATA TO PLAN FOR FUTURE YEARS.
NUMEROUS STREETS WERE COMPLETED LAST YEAR AND WERE ACCOMPLISHED WITHIN THE TWO TO THREE MONTHS OF THE FISCAL YEAR THAT REMAINED AFTER COUNCIL APPROVAL OF THE PLAN.
WE'D LIKE TO CONTINUE WITH THAT PROGRESS AND WE NEED THE DATA TO DO SO.
THOSE STAFF INCLUDED ONE HUNDRED THOUSAND DOLLARS IN THE BUDGET AMENDMENT FOR A NEW STREET ASSESSMENT FOR THE BOARD'S CONSIDERATION.
THE SECOND BULLET UNDER THE LONG TERM GOAL IS CONSIDERATION FOR EXPANDING THE MENU OF MAINTENANCE OPTIONS FOR THE STREET MAINTENANCE PROGRAM.
UNDERSTANDING THAT OTHER TECHNIQUES HAVE BEEN USED PREVIOUSLY THAT THE BOARD DOES NOT WISH TO REPEAT. STAFF DOES HAVE A RECOMMENDATION FOR YOU THIS EVENING THAT WE'D LIKE TO PROPOSE. SO REVIEWING FROM LAST YEAR, THIS IS A DETERIORATION CURVE FOR STREETS, IT SHOWS A TYPICAL TWENTY FIVE YEAR STREET WHEN THE STREET IS INITIALLY CONSTRUCTED, IT'S IN EXCELLENT CONDITION, WHICH IS AT THE TOP RIGHT ALONG THE BOTTOM SHOWS THE TIME AND AS TIME PASSES, THAT THE QUALITY OF THE STREET DETERIORATES OVER TIME.
SO THIS MAP, OR THIS GRAPH SHOWS YOU A TYPICAL STREET THAT'S HAD NO MAINTENANCE.
I SHOWED YOU THIS ONE AS WELL LAST YEAR, SO UP AT THE TOP YOU'LL SEE THAT CURVE MOVING.
SO WHEN THE STREET IS STILL GOOD IN GOOD OR EXCELLENT CONDITION, IF YOU DO THAT PAVEMENT PRESERVATION, YOU KNOW SOMETHING THAT COSTS ABOUT A DOLLAR OR SO, YOU'RE ABLE TO PROLONG THE LIFE OF THE STREET SO THAT 20 YEAR STREET BECOMES A, YOU KNOW, TWENTY FIVE, THIRTY OR THIRTY FIVE YEAR STREET.
SO RIGHT NOW, WHAT WE DO IS WE WE DO CRACK CEILING AT THE GOOD OR EXCELLENT CONDITION AND THEN OUR NEXT STEP IS MILL AND OVERLAY.
SO WE'RE KIND OF MISSING AN OPPORTUNITY TO GET IT, YOU KNOW, TO GET TO THE STREETS WHEN THEY'RE IN GOOD OR FAIR.
EXCUSE ME. GOOD OR FAIR CONDITION.
AND EVERY DOLLAR THAT YOU SPEND TODAY IN KEEPING A.
OH YES, MA'AM. NOT TOO LONG AGO.
SO YOU'RE GOING TO GO BACK AND CRACK AND SEAL IT.
SO IT WAS DONE LIKE THREE YEARS AGO.
SO THAT'S THE PLAN IS TO TRY TO DO THE NEW STREET AND THEN CRACK AND SEAL IT RIGHT, LIKE THREE YEARS LATER. RIGHT.
THERE'S NOT NECESSARILY A SPECIFIC TIME FRAME FOR IT, NECESSARILY.
BUT WHEN THERE'S CRACKS, YOU DO WANT TO SEAL IT AS QUICKLY AS YOU CAN BECAUSE IT DOES PRESERVE THE, YOU KNOW, THE GOOD ROAD, THE GOOD SURFACE THAT WE'VE JUST PLACED.
THERE'S NOT THAT MUCH WRONG WITH ELDON DODSON IS THERE.
NOW, YOU KNOW THAT IT WOULD REQUIRE A LOT OF MAINTENANCE.
ON ELDON, THAT'S THE ONE THAT THE COUNTY JUST DID NOVEMBER.
[INAUDIBLE] TO GET PREVENTATIVE MAINTENANCE? ACTUALLY, THERE'S THERE WERE SOME CRACKS.
WE'VE NOTICED A COUPLE OF CRACKS IN IT AND IT DID GET A LITTLE BIT OF CRACK SEALING, I BELIEVE, THIS WEEK, BUT THAT'S NOT.
WE DON'T TYPICALLY GO BACK NECESSARILY THEY YEAR AFTER, BUT PRETTY CLOSE.
SO FOR EVERY DOLLAR YOU SPEND IN KEEPING GOOD ROADS IN GOOD CONDITION, IT PRECLUDES SPENDING OF SIX TO 14 OR 16 DOLLARS TO REBUILD ONE THAT'S BEEN THAT'S DETERIORATED.
SO BASICS OF ASPHALT PRESERVATION, ASPHALT PAVEMENT IS MADE OF TWO COMPONENTS AGGREGATE, WHICH IS ROCK AND ASPHALT BINDER, WHICH IS THE GLUE THAT HOLDS IT ALL TOGETHER.
THE KEY TO EXTENDING PAVEMENT LIFE IS TO PRESERVE THE ASPHALT BINDER AND STOP THE
[00:20:04]
OXIDATION BECAUSE OXIDATION CAUSES RAVELING.SO YOU LOSE THE BOND BETWEEN ALL OF THE ROCKS.
WHICH LEADS TO CRACKING OF THE SURFACE, SO THIS IS WHAT YOU SEE ON YOUR ON YOUR STREETS WHEN WHEN YOU DON'T STOP THE OXIDATION.
SO THE PRIMARY CAUSES OF OXIDATION ARE UV RAYS WHICH IS SUNLIGHT MOISTURE, WHICH IS RAIN AND THEN THE OXYGEN THAT'S IN THE AIR.
SO WHEN WITH RESIDENTIAL STREETS, THESE ARE THE PRIMARY FACTORS THAT WERE BATTLING IN PAVEMENT PRESERVATION.
SO AS WE MANAGE PAVEMENTS, THE GOAL IS TO DO EVERYTHING WE CAN TO MITIGATE THESE FACTORS AND KEEP THOSE VITAL OILS FROM ESCAPING THE ASPHALT PAVEMENT THAT'S LEFT UNTREATED ALLOWS THE VITAL OILS TO ESCAPE, WHICH HARDENS THE ASPHALT BINDER PREMATURELY.
OTHER CONVENTIONAL SEALERS STILL ALLOW SOME UV LIGHT AND MOISTURE TO PENETRATE THE PAVEMENT, WHICH ACCELERATES DISTRESS AND LEADS TO ALLIGATOR CRACKING.
THERE IS A PRODUCT THE STAFF WOULD LIKE THE BOARD TO CONSIDER THE HA5 HIGH DENSITY MINERAL BOND IS MORE DURABLE AND PERFORMS LONGER THAN OTHER CONVENTIONAL TREATMENTS IF PLACED ON THE RIGHT STREETS, AND IT WILL EXTEND THE LIFE OF THE STREAM.
HA5 CREATES AN IMPERMEABLE SURFACE, EXCUSE ME, AN IMPERMEABLE MEMBRANE OVER THE PAVEMENT, WHICH LOCKS IN THOSE VITAL OILS TO KEEP THE ROAD FLEXIBLE, WHICH IS KEY TO EFFECTIVELY MANAGING PAVEMENTS.
HERE ARE PHOTOS OF OTHER CITIES THAT HAVE USED THE HA5 PRODUCT AND THE RESULTS OF THE APPLICATION ON THEIR STREETS.
OUR NEIGHBORING CITY TO THE WEST CITY OF HURST HAS BEEN USING THE HA5 PRODUCT SINCE 2019.
THESE ARE FIELD PHOTOS TAKEN BY STAFF OF STREETS THAT HAVE BEEN RECENTLY RESURFACED IN HURST. THE COLORED MAP ON THE RIGHT IS A SEQUENCE BY DAYS.
THIS IS SOMETHING THAT THE CONTRACTOR PUTS TOGETHER.
THEY FOLLOW THIS WHEN THEY TREAT A NEIGHBORHOOD.
THIS PARTICULAR EXCUSE ME, THIS PARTICULAR MAP OF THE NEIGHBORHOOD IN HURST WAS TREATED LAST YEAR, AND THE PHOTO ON THE TOP RIGHT WAS TAKEN IMMEDIATELY AFTER THE HA5 APPLICATION. SO YOU CAN SEE FROM THE PHOTOS 2019 TO 2020 AND 2021.
THEY STILL LOOK REALLY PRETTY GOOD AND WE'VE SPOKEN WITH STAFF AT THE CITY OF HURST AND THEY CAN'T SAY ENOUGH GOOD THINGS ABOUT IT.
STAFF RECOMMENDS MOVING FORWARD WITH AN INNER LOCAL AGREEMENT WITH THE CITY OF HURST FOR A TRIAL APPLICATION OF THE HA5, HIGH DENSITY MINERAL BOND FUNDS FOR THIS WORK WILL COME FROM THIS FISCAL YEAR'S BUDGET UNDER THE CONTRACTUAL SERVICES LINE ITEM.
TOTAL COSTS FOR THESE PARTICULAR STREETS WILL BE APPROXIMATELY TWO HUNDRED AND SEVENTY FIVE THOUSAND DOLLARS.
THERE'S CURRENTLY THREE HUNDRED THOUSAND DOLLARS IN THE OPERATING BUDGET FOR COUNTY MILL AND OVERLAY UNDER CONTRACTUAL SERVICES THAT MAY BE REALLOCATED FOR THIS WORK.
IF WE CHOOSE TO MOVE FORWARD BECAUSE WE'RE GOING TO BE USING THAT, EXCUSE ME, WE'RE GOING TO BE USING THE BOND MONEY TO DO THE WORK WITH THE COUNTY FOR HARVARD ROAD AND FOREST RIDGE, SO THAT LEAVES THIS LINE ITEM AVAILABLE.
OK, JUST TO REAFFIRM WE'RE NOT SACRIFICING ANYTHING TO DO THAT.
WE ARE NOT IT'S IN OUR CURRENT BUDGET.
WE'RE NOT SACRIFICING A PROJECT BECAUSE BOND MONEY IS BEING USED FOR THOSE OTHER STREETS.
NO, WE'RE NOT GIVING UP ONE PROJECT IN ORDER TO DO THIS.
NO, WE'RE DOING FOREST RIDGE THIS YEAR AND WE'RE ACTUALLY MOVING HARWOOD UP THIS YEAR, AND THE COUNTY GIVES US A LITTLE BIT OF SAVINGS, SO WE'RE EVEN SAVING ON THE BOND MONEY AS WELL. OK. THANKS.
OK. SO HERE WE'RE BACK TO THAT YEAR, THAT MAP OF THE YEAR TWO PROJECTS.
AND THIS IS HOW IT LOOKS IN THE FIVE YEAR PLAN.
THE TOTAL PLAN FOR THOROUGHFARES IN YEAR TWO IS APPROXIMATELY $2 MILLION, AND THAT WILL COME FROM THE THOROUGHFARE BOND AND FOR RESIDENTIAL STREETS IT'S ABOUT TWO MILLION AS WELL, WHICH INCLUDES THE NEW CONDITION ASSESSMENT AND THE PROPOSED SURFACE TREATMENT FOR PRESERVATION. SO THAT BRINGS US TO THE BUDGET AMENDMENT.
THE OPERATING BUDGET DID NOT INCLUDE FUNDS FOR RESIDENTIAL STREETS YEAR TWO PROJECTS WILL REQUIRE THE FOLLOWING, SIX HUNDRED THOUSAND DOLLARS FOR ASPHALT FOR RESIDENTIAL STREETS.
THREE HUNDRED AND FIFTY THOUSAND DOLLARS FOR ENGINEERING DESIGN OF [INAUDIBLE] DRIVE.
AND GREGORY [INAUDIBLE] STREET CONSTRUCTION PROJECT PROJECTS.
THOSE TWO PROJECTS WERE SLATED FOR THIS FISCAL YEAR FOR RECONSTRUCTION.
WE'LL NEED ONE HUNDRED THOUSAND DOLLARS FOR A NEW STREET ASSESSMENT, WHICH WILL PROVIDE THE DATA TO CONTINUE TO REPLACE STREETS THROUGHOUT THE CITY, AND FIVE HUNDRED AND TWENTY THOUSAND DOLLARS IS THE CITY'S PORTION THAT WILL COVER THE REMAINING COST OF DESIGN AND RECONSTRUCTION OF WALTER STREET AS PART OF TARRANT COUNTY'S COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM FOR A TOTAL BUDGET AMENDMENT OF ONE MILLION FIVE HUNDRED AND SEVENTY THOUSAND DOLLARS.
[00:25:06]
NEXT STEPS. OK.WITH THE APPROVAL OF THE BUDGET AMENDMENT FROM THE BOARD THIS EVENING, IT WILL MOVE FORWARD TO THE CITY COUNCIL FOR THEIR APPROVAL.
STAFF WILL PROCEED WITH THE YEAR TWO PROJECTS, WHICH INCLUDES THOROUGHFARES, RESIDENTIAL STREETS AND A TRIAL TRIAL OF THE SURFACE TREATMENT, AS WELL AS A NEW STREET ASSESSMENT.
OUR NEXT MEETING IS PLANNED FOR JULY.
SO BASED ON THE FEEDBACK WE RECEIVED ON THE SURFACE TREATMENT, WE MAY BRING BACK ADDITIONAL STREETS FOR SURFACE TREATMENT IN YEAR THREE.
SO THE LAST ITEM IS FUTURE PROJECTS, IF YOU'LL RECALL.
COUNTY VOTERS APPROVE THE TARRANT COUNTY TRANSPORTATION BOND PROGRAM IN NOVEMBER OF 2021 . THE LIST INCLUDED TWO THOROUGHFARES IN AND ADJACENT TO THE CITY OF BEDFORD, WHICH IS BROWN TRAIL AND [INAUDIBLE] BROWN TRAIL FROM HARWOOD ROAD TO STATE HIGHWAY 183 IS A PARTNERSHIP WITH THE CITY OF HURST AND WILL INCLUDE CONSTRUCTION OF CONCRETE STREET WITH DIVIDED LANDSCAPE MEDIANS AND SIDEWALKS AND [INAUDIBLE] ROAD IS A PROJECT THAT WAS SUBMITTED BY THE CITY OF [INAUDIBLE].
THOSE IMPROVEMENTS WILL INCLUDE WIDENING OF THE ROADWAY FROM TWO LANES TO THREE DRAINAGE AND WALKING TRAIL IMPROVEMENTS.
STAFF WILL UPDATE THE BOARD AND THE COUNCIL AS THESE PROJECTS DEVELOP.
YES, SIR. QUESTION ON THE END, YOU MAY NOT HAVE THE ANSWER, AND THE WALKING TRAILS, WILL IT BE ON OUR SIDE OR THEIR SIDE? I DON'T KNOW THE ANSWER TO THAT YET, SO WE'RE REALLY EARLY IN THE PROCESS.
OKAY. SO WE'LL KEEP YOU UPDATED ON THESE AS THEY PROGRESS.
THEY'VE BEEN TALKING ABOUT IT FOR A LONG TIME.
WELL, LET ME SAY, THERE'S BEEN A COLLABORATIVE EFFORT TO MAKE THAT HAPPEN.
THERE'S BEEN A LOT OF CONVERSATIONS AND I WANT TO GO OUT OF MY WAY TO SAY THANK YOU TO EVERYONE ON TRTC.
THANK YOU TO EVERYONE DOWN TO THE COUNTY BECAUSE THEY HAD A BIG HAND IN HELPING US PUSH THESE ITEMS THROUGH SO.
WE DO NEED A MOTION FOR THE BUDGET AMENDMENT BEFORE WE MOVE ON TO THE FINAL PRESENTATION OF THE MEETING. I MOTION TO APPROVE.
DO YOU MIND IF I ASK ONE QUESTION REAL QUICK? OK, A COUPLE OF QUESTIONS.
THE STREET ASSESSMENT, ARE YOU GOING TO PUT THAT OUT FOR BID? YOU'RE PROBABLY NOT, ARE YOU? NOT FORBID. WE'LL TALK TO A COUPLE OF VENDORS.
ARE YOU GOING TO USE [INAUDIBLE] FOR THAT? IF THE BOARD WISHES, WE WOULD USE [INAUDIBLE].
OK, I'LL TAKE THAT AS AN ANSWER.
SO AT THE END OF THE DAY, WHAT IS IT THAT YOU'RE GOING TO GET FROM THE STREET ASSESSMENT? IS IT A GRADING PROGRAM LIKE WE SAW FROM [INAUDIBLE]? I MEAN, WHAT IS THE END RESULT YOU'RE GOING TO GET ON THAT? SO ALL OF THESE STREET ASSESSMENTS ARE SOMEWHAT SIMILAR.
THEY'VE GOT THE FANCY MACHINE THAT RIDES ALL THE STREETS.
IT GIVES YOU THE DATA THAT TELLS YOU HOW ROUGH IT RIDES.
IT TELLS YOU HOW MANY CRACKS YOU CAN SEE.
IS THIS GOING TO BE THAT EXTENSIVE? OKAY, DO YOU KNOW WHERE I'M GOING WITH THIS? I DON'T.
DO YOU KNOW HOW MUCH THE [INAUDIBLE] ASSESSMENT WAS? I DO. AND HOW MUCH IS THIS ASSESSMENT? THERE'S A BIG DISPARITY.
AND IT WAS A ROUND NUMBER THAT I'VE CHOSE.
I KNOW I KNOW WHAT THE [INAUDIBLE] AMOUNT WAS AND I DON'T ANTICIPATE IT TO BE THE FULL HUNDRED THOUSAND. I KNOW THAT IN SPEAKING WITH DIFFERENT VENDORS, THEY OFFER DIFFERENT THINGS BESIDES JUST THE ROAD ASSESSMENT.
SOME VENDORS ALLOW THEY'LL HAVE LIKE AN [INAUDIBLE] MENU OF DO YOU WANT US TO PROVIDE YOU DATA LIKE GPS DATA FOR YOUR SIGNS OR FOR YOUR SIDEWALKS OR FOR YOUR CURBS OR SOMETHING LIKE THAT? AND SO I DON'T ANTICIPATE IT BEING HIGHER THAN THAT.
AS WE GO FORWARD, WHAT SHOULD WE ANTICIPATE AS A GROUP WITH RESPECT TO ONGOING STREET ASSESSMENTS? IS THIS SOMETHING WE SHOULD BE DOING EVERY COUPLE OF YEARS, EVERY FIVE YEARS ? MAYBE THREE THREE.
WOULD IT BE SIMILAR TO THIS PARTICULAR ASSESSMENT EVERY THREE YEARS? WILL IT BE A $400000 ASSESSMENT EVERY THREE YEARS? I, NO.
OK. ALL RIGHT. THAT'S KIND OF WHERE I'M GOING WITH SOME OF THAT.
SO WE'VE GOT ALL THESE EXAMPLES OF HOW IT WORKS OR THAT IT DOES WORK, BUT WE'RE STILL GOING TO DO OUR OWN TEST.
WHAT WE DECIDED WAS A TRIAL WOULD BE JUST ABOUT THE MINIMUM THAT THEY WOULD ALLOW IN THEIR CONTRACT. IF WE WANTED TO DO MORE, WE COULD DO MORE AND I'M CALLING IT A TRIAL BECAUSE IF WE DECIDE THAT WE DON'T LIKE IT OR WE GET REALLY BAD FEEDBACK, WE DON'T HAVE TO DO IT AGAIN. AND HOW LONG IS IT TO LAST? I BELIEVE I READ THAT THEY PROVIDE, THINKING IT WAS LIKE A FIVE YEAR WARRANTY OR LIKE A
[00:30:05]
FIVE YEAR MAINTENANCE BOND ON IT.THEY'LL COME BACK IF WITHIN THE FIRST FIVE YEARS, IT GOES BAD.
IF IT'S DOESN'T WORK, IF SOMETHING IS NOT RIGHT.
SO IF WHAT? WHAT DO YOU SUSPECT WILL HAPPEN THAT WE WOULD SAY WE WOULDN'T LIKE IT? IT PEELS OFF, IT LOOKS LIKE FOREST RIDGE, OR IT LOOKS LIKE, YOU KNOW, THE SURFACE OF HARWOOD ROAD WHERE IT'S REALLY, REALLY ROUGH.
THAT'S WHY WE TRIED TO TAKE THE PICTURES OF HURST.
WE KNEW THAT THOSE STREETS WERE LOCAL AND WE WANTED TO SHOW PICTURES FROM AT LEAST THE PAST FEW YEARS THAT THEY'VE BEEN APPLYING IT.
I BELIEVE THERE WAS ONE NEIGHBORHOOD WHERE THEY DIDN'T LOVE HOW IT LOOKED OR THE CITY HAD COMPLAINED ABOUT SOMETHING, AND THEY WERE IN DISCUSSIONS ABOUT COMING BACK AND DOING, YOU KNOW, A HANDFUL OF STREETS FOR THE CITY OF HURST.
SO THERE THERE IS SOME TREPIDATION.
I DIDN'T SEE I DIDN'T SEE WHERE THE WHERE THE ISSUES WERE WHEN I WENT OUT THERE AND I LOOKED AT THOSE STREETS, THEY'RE ALL BLACK AND THEY LOOK REALLY NICE AND THE NEIGHBORS SEEM TO LIKE IT. THE PROPERTY OWNERS WERE THRILLED TO HAVE THEM IN THERE IN THEIR NEIGHBORHOOD. YEAH. OK, THANK YOU.
ANY OTHER QUESTIONS? COMMENTS? WE GOT A MOTION TO APPROVE.
YOU'RE SUPPOSED TO DO ALL THE SECONDS.
ALL RIGHT. I SECOND THE MOTION THEN.
OPPOSED NAY? THE MOTION CARRIES. THANK YOU.
SO WE HAVE ONE AGENDA ITEM LEFT THE DISCUSSION OF THE POLICY FOR NEW SIDEWALKS.
ALL RIGHT. THE PURPOSE OF THIS POLICY IS TO PROVIDE A SET OF GUIDELINES REGARDING REQUESTS FOR THE INSTALLATION OF SIDEWALKS WITHIN THE CITY OF BEDFORD IN DEVELOPED AREAS WHERE SIDEWALKS DO NOT CURRENTLY EXIST.
GENERAL GUIDELINES FOR THIS POLICY INCLUDE IMPROVING SAFETY FOR PEDESTRIANS, CREATING A SIDEWALK NETWORK THAT CONNECTS TO OTHER PEDESTRIAN FACILITIES SUCH AS SCHOOLS, CITY PARKS, AND CITY FACILITIES THAT ARE OPEN TO THE PUBLIC AND PROVIDING A TIME FRAME FOR THE REQUEST TO BE EVALUATED.
CITIZENS MAY SUBMIT REQUESTS AT ANY TIME REQUESTS RECEIVED BY APRIL 1ST OF EACH FISCAL YEAR WILL BE CONSIDERED IN THE UPCOMING BUDGET.
REQUESTS RECEIVED AFTER APRIL 1ST WILL BE CONSIDERED IN THE FOLLOWING FISCAL YEAR.
CITIZENS WILL BE REQUIRED TO SUBMIT THE COMPLETED FORMS AND THESE FORMS ARE INCLUDED IN YOUR PACKET THIS EVENING.
WHEN MULTIPLE REQUESTS ARE RECEIVED, THE BOARD MAY CHOOSE TO BASE THE RECOMMENDATION ON A PRIORITIZATION SUCH AS PROXIMITY TO [INAUDIBLE] PROPERTIES, CITY PARKS OR CITY FACILITIES THAT ARE OPEN TO THE PUBLIC, SUCH AS THE LIBRARY OR THE OLD BEDFORD SCHOOL.
THIS MAP ALSO SHOWS THE NEW RECREATION CENTER GENERATION'S PARK THAT IS SCHEDULED TO OPEN TO THE PUBLIC LATER THIS YEAR.
THERE ARE IMPORTANT GUIDELINES THAT REQUESTERS AND PROPERTY OWNERS THAT SIGN THE PETITION NEED TO BE AWARE OF.
THE FOLLOWING ITEMS WILL BE INCLUDED IN THE CONSTRUCTION OF NEW SIDEWALKS AT THE CITY'S EXPENSE METER BOX RELOCATIONS, MAILBOX RELOCATIONS, DRIVEWAY ADJUSTMENTS TO MEET MINIMUM SLOPES, RETAINING WALLS REQUIRED TO MEET MINIMUM SLOPES, IRRIGATION AND IRRIGATION ADJUSTMENTS THAT BOTTOM CENTER PHOTO.
NO THE BOTTOM PHOTO ON THE RIGHT SHOWS A RETAINING WALL THAT WAS INSTALLED IN ORDER TO MEET MINIMUM SIDEWALK GRADES.
IT WAS A DRASTIC CHANGE TO THE PROPERTY OWNERS FRONT YARD AND WASN'T EXPECTED WHEN THEY SIGNED THE PETITION FOR THE SIDEWALK.
THESE NEXT ITEMS WILL NOT BE INCLUDED IN CONSTRUCTION OF THE SIDEWALK, REPLACEMENT OF ANY EXISTING TREES, PLANTER BOXES OR OTHER LANDSCAPING THAT ARE WITHIN THE PROPOSED PATH THAT IS REMOVED FOR THE SIDEWALK INSTALLATION, DECORATIVE DRIVEWAYS WILL BE REPLACED WITH STANDARD CONCRETE, AND NO ADDITIONAL IRRIGATION WILL BE INSTALLED.
THE CONTRACTOR WILL BE RESPONSIBLE FOR RESTORATION OF THE IRRIGATION THAT IS REMOVED FOR THE SIDEWALK INSTALLATION, BUT THEY WILL NOT RECONFIGURE ZONES OR ADD ANY ADDITIONAL IRRIGATION, AND NO REIMBURSEMENT IS GOING TO BE PROVIDED TO THE PROPERTY OWNERS BY THE CITY FOR THE REMOVAL OF ANY OF THESE IMPROVEMENTS.
WITH EACH REQUEST, STAFF WILL EVALUATE THE NEED FOR ENGINEERED PLANS, WHICH WILL DEPEND ON THE LENGTH OF THE SIDEWALK AND EXISTING TOPOGRAPHY.
STAFF WILL PROVIDE THIS BOARD WITH A PRELIMINARY COST OF THE DESIGN AND CONSTRUCTION FOR CONSIDERATION IN THE NEXT FISCAL YEAR'S BUDGET AND AFTER APPROVAL BY THE BOARD.
AN ENGINEERING CONTRACT FOLLOWED BY A CONSTRUCTION CONTRACT WILL MOVE FORWARD FOR CITY COUNCIL. APPROVAL IS NEEDED.
NOT SURE IF ANY OF YOU ARE AWARE OF THE RECENT REQUEST FOR NEW SIDEWALKS, BUT WE DID
[00:35:02]
RECEIVE ONE ALONG THE SOUTH SIDE OF [INAUDIBLE] AVENUE, FROM THE HURST CITY LIMITS TO BROWN TRAIL. THE PHOTOS ABOVE SHOW THE AREA OF THE REQUEST.THE DRIVEWAYS WILL LIKELY HAVE TO BE RECONSTRUCTED ALL THE WAY UP TO THE HOUSES.
STAFF WILL ENGAGE AN ENGINEERING CONSULTANT TO PROVIDE A PROPOSAL FOR THE DESIGN AND A PRELIMINARY COST ESTIMATE THAT WE WILL BRING FORWARD TO THE BOARD IN JULY FOR CONSIDERATION IN THE NEXT FISCAL YEAR.
IN DEVELOPED NEIGHBORHOODS, FRONT YARDS, DRIVEWAYS, MAILBOXES, METER BOXES, PLANTER BOXES AND TREES MAY BE IMPACTED WITH THE INSTALLATION OF SIDEWALKS.
THE COST OF SIDE OF THIS SIDEWALK SEGMENT COULD BE UPWARDS OF TWO TO THREE HUNDRED THOUSAND, WITH ALL OF THE DRIVEWAYS THAT NEED TO BE REPLACED AND THE RETAINING WALLS ALONG THE FRONT OF EACH OF THESE YARDS.
STATE LAW REQUIRES THAT SIDEWALK PROJECTS IN EXCESS OF $50000 SHALL BE SENT TO THE TEXAS DEPARTMENT OF LICENSING AND REGULATION FOR A REVIEW OF THE PLANS FOR COMPLIANCE WITH AMERICAN DISABILITIES ACT, ADA REGULATIONS AND THEN FOR INSPECTION BY THE [INAUDIBLE] AT THE COMPLETION OF THE CONSTRUCTION.
STAFF WILL DETERMINE IF ENGINEERING MAY BE REQUIRED FOR A NEW SIDEWALK REQUEST, DEPENDING ON THE SCOPE. SO THIS IS A PRIME EXAMPLE FOR THE POLICY AND THE PROCESS THAT WE'VE OUTLINED THIS EVENING.
THE STEEP DRIVEWAYS THE GRADES WILL REQUIRE REPLACEMENT OF THE ENTIRE DRIVEWAYS ALL THE WAY UP TO THE HOUSE. IT'S GOING TO REQUIRE REMOVAL OF SOME MATURE TREES AND LANDSCAPING IN THE RIGHT OF WAY AND THE NEED FOR AN ENGINEERING DESIGN TO MEET ADA AND [INAUDIBLE] RULES AND REGULATIONS.
SO WHEN WE MEET IN JULY, STAFF WILL BRING THE COST FOR THAT ENGINEERING, DESIGN, AND CONSTRUCTION TO THE BOARD FOR CONSIDERATION OF THE [INAUDIBLE] AVENUE SIDEWALK CONSTRUCTION PROJECT.
THIS POLICY IS INCLUDED IN YOUR PACKET WHEN WE FINALIZE THE POLICY, ADDITIONAL PHOTO EXAMPLES SUCH AS THE ONES THAT WERE IN THIS PRESENTATION WILL BE ADDED TO THE PACKET.
PROPERTY OWNERS THAT SIGN THE PETITIONS WILL BE MADE AWARE OF THE POTENTIAL IMPACTS TO THEIR PROPERTY BECAUSE THE LAST THING YOU WANT IS TO BE SURPRISED AND DISAPPOINTED WHEN THE SIDEWALKS ARE INSTALLED.
DOES ANYBODY HAVE ANY QUESTIONS ON THE POLICY? SO IN THAT SITUATION, [INAUDIBLE] TAYLOR AVENUE THAT YOU WERE TALKING ABOUT THE.
BECAUSE OF THE EXTENT OF WHAT WOULD HAVE TO BE DONE THERE AND THE IMPACT ON INDIVIDUAL PEOPLE'S LANDSCAPING UP AND DOWN THAT STREET.
WHAT, IS THERE A LEVEL OF COMMUNICATION WITH THE RESIDENTS FOR THEM TO UNDERSTAND WHAT PUTTING IN THOSE SIDEWALKS WOULD DO TO THEIR PROPERTY OR WOULD DO TO THAT PROPERTY, I.E.
TREES BEING REMOVED, LANDSCAPING BEING REMOVED? IS THERE COMMUNICATION THAT TAKES PLACE BETWEEN THE DEPARTMENT AND THE RESIDENTS? SO THAT WAY, THEY ARE NOT SURPRISED AFTER YOU DO IT.
DURING CONSTRUCTION. IT'S DURING CONSTRUCTION, SO YOU DON'T SIT DOWN WITH THEM IN ADVANCE TO LET THEM KNOW, HEY, WE HAD A REQUEST FOR THIS.
WE WANTED YOU TO KNOW WHAT THE IMPACT WOULD BE ON.
THAT WAS NOT DONE ON THE [INAUDIBLE] ONE.
NO, IT WAS NOT. SO THAT WAS THE INTENT ON THE POLICY.
THAT WAS THE REASON WHY WE WANT 100 PERCENT OF THE SIGNATURES BECAUSE IF ONE PERSON SAYS NO, UH OH, WHAT DO WE DO? WE, YOU KNOW, WE CAN'T MEET THOSE GRADES AND THEN.
WE WANTED TO INCLUDE THESE PHOTO EXAMPLES AND THOSE SPECIFIC WORDING IN THERE THAT SAYS, WE'RE TAKING IT OUT AND WE'RE NOT PAYING YOU BACK.
HERE'S SOME PICTURES OF WHAT THE DRIVEWAYS MAY LOOK LIKE.
HERE'S PICTURES OF RETAINING WALLS.
I MEAN, ON SHADY BROOK, THEY ALL SIGNED THE PETITION.
THEY ALL WANTED IT. SO, YOU KNOW, AT THE END OF IT, IT WAS A BIG CELEBRATION THAT IT WAS IN. BUT THOSE INDIVIDUAL PROPERTY OWNERS WERE.
I GUESS OBVIOUSLY ANY SITUATION WHERE WE CAN COMMUNICATE AND FOREWARN ANY OF THESE KIND OF DRASTIC CHANGES WOULD BE ENCOURAGED HERE.
SO WE WOULD ACTUALLY PAY FOR THE DRIVEWAY TO BE PULLED OUT AND PUT BACK IN.
IF WE'RE PUTTING IN A SIDEWALK, SAY YOUR DRIVEWAY IS SUPER STEEP.
YOU NEED A TWO PERCENT SIDEWALK IN ORDER TO MEET ADA REGULATIONS.
SO YOU TAKE A SIDEWALK THAT'S LIKE THIS.
YOU FLATTEN IT AND THAT'S STEEPENS YOUR DRIVEWAY AND YOU BASICALLY HAVE TO BUILD THE DRIVEWAY A LITTLE BIT ALL THE WAY BACK UP TO THE HOUSE.
SO HOW MANY HOUSES ARE INVOLVED IN THAT? DO YOU KNOW? I DON'T.
WE WILL HAVE BETTER INFORMATION ABOUT THAT WHEN WE GET WITH WITH THE DESIGN ENGINEER TO KIND OF PUT TOGETHER FOR US A CONCEPTUAL LAYOUT AND A PRELIMINARY COST ESTIMATE.
AND THEY ALREADY HAVE SIGNATURES OR KNOW THIS.
AND THEY DON'T KNOW THAT IT'S GOING TO REQUIRE THEIR DRIVEWAYS TO BE YANKED OUT.
[00:40:05]
YEAH, BUT. YEAH, ALL THE MORE REASON TO IN ADVANCE COMMUNICATE THAT TO THEM.THE SIDEWALKS WILL BE IN COMPLIANCE, BUT YOUR DRIVEWAY, YOU WON'T BE ABLE TO GET A WHEELCHAIR UP IT. THEY'LL BE STEEP.
WITH WHAT YOU KNOW NOW, WOULD YOU STILL SIGN THE PETITION.
RIGHT. YEAH. AND THAT WAS THE POINT OF THE PICTURES.
IT FIGURES WE HAVE THIS ISSUE ON CHERYL TAYLOR AVENUE.
IT'S ALL I'M SAYING. PERFECT EXAMPLE, RIGHT? IS THERE ANY UM, IS THERE ANY TALK OF SHARED COST? LOOK ON THAT NOTE.
WELL. MAY I RESPOND? APPARENTLY NOT.
AS I'VE BEEN. I'M GOING TO SAY NO.
KIND OF THE ELEPHANT IN THE ROOM.
IT'S, YOU KNOW, BEDFORD IS ONE OF THE VERY, VERY FEW CITIES, AT LEAST FROM MY EXPERIENCE AND KNOWLEDGE, TO WHERE THE CITY BEARS ALL OF THE COSTS FOR CONSTRUCTION AND MAINTENANCE FOR SIDEWALKS.
TYPICALLY, SAY A RESIDENT HAS A SIDEWALK THAT'S DAMAGED OR THE, YOU KNOW, SOME OF IT IS SUNK. SO THE DEGREE IS OFF, IF YOU WILL, THE ANGLE.
IT'S A CODE ISSUE AND YOU KNOW, CITIES WILL HAVE FUNDS SET ASIDE IF PEOPLE WANT TO, YOU KNOW, HAVE THE THE COST ADDED TO THEIR WATER BILL, LIKE OVER 12 MONTHS INTEREST FREE.
BUT IN BEDFORD, IT'S ALL ON US.
AND SO THERE'S NOT CURRENTLY A MECHANISM TO WHERE I MEAN, JUST CANDIDLY, IF YOU LOOK AT THE COST, NOT THAT YOU WERE SAYING THIS, AMY, BUT MAYOR [INAUDIBLE] WELL, I APOLOGIZE.
BUT IF YOU HAVE SOMEONE THAT YOU KNOW IN THIS AREA, FOR EXAMPLE, THE COST IS GOING TO BE PRETTY SIGNIFICANT VERSUS AREAS WHERE THE DRIVEWAY WOULD NEED TO BE REPLACED.
WELL, IF A RESIDENT KNOWS THAT THEY'RE GOING TO HAVE TO PAY A CERTAIN AMOUNT OF MONEY, IT MIGHT AFFECT WHETHER OR NOT THEY REALLY WANT THAT SIDEWALK.
AND SO IT'S, IT IS PROBLEMATIC, QUITE FRANKLY, BECAUSE THE CITY ALWAYS HAS TO BE RESPONSIBLE FOR IT.
BUT CANDIDLY, JUST BEING HONEST POLITICALLY, IT MAKES IT DIFFICULT TO PUT THE GENIE BACK IN THE BOTTLE. SO WE'VE ACTUALLY TALKED ABOUT, DOES IT MAKE SENSE? AND WE'RE NOT RECOMMENDING THIS YET, BUT WE I THINK IT'S SOMETHING THAT'S WORTH DISCUSSING. IS THERE A CERTAIN TIME FRAME WHERE WE SAY, OK, FROM THIS POINT MOVING FORWARD, YOU KNOW, THE CITY WILL SPLIT THE COST OR SAY, WE DO [INAUDIBLE] AVENUE AND WE SAY, OK. PART OF THE THE UNDERSTANDING IS THAT ANY FUTURE REPAIRS ARE THE RESPONSIBILITY OF THE PROPERTY OWNER, SOMETHING TO WHERE ULTIMATELY PROPERTY OWNERS HAVE A LITTLE MORE SKIN IN THE GAME.
AND CANDIDLY, THAT WILL ALLOW US TO MAKE EVEN MORE IMPROVEMENTS.
BUT SORRY FOR THE DISSERTATION, BUT IT'S KIND OF A DELICATE CONVERSATION.
SO I WANT TO KIND OF DO CHERYL A SOLID AND KIND OF TAKE THE LEAD ON IT.
SO YOU PUT IN SIDEWALKS ON BOTH SIDES OF THE STREET.
THE REQUEST IS FOR THE SOUTH SIDE OF THE STREET.
THE OTHER DIFFICULTY IN THE SPLIT, THE COST IS MOST OF THE TIME PEOPLE DON'T TELL YOU I WANT A SIDEWALK ON MY PROPERTY.
IT'S USUALLY I WANT IT OVER THERE.
SO WHO PAYS FOR IT THEN? WOW, OK.
SO I GUESS BASED ON WHAT I'M HEARING, WE MAY NOT HAVE ENOUGH EXPERIENCE IN THE AUDIENCE TO GO BACK FAR ENOUGH.
HAS THIS EVER BEEN AN ISSUE IN RECENT YEARS? I KNOW THAT THE OTHER SIDE IS CHERYL.
MY DAUGHTER ACTUALLY LIVES ON CHERYL ON THE HURST SIDE, AND THEY JUST HAD SIDEWALK PUT OVER THERE, SO I DIDN'T KNOW IF THAT WAS AN OPTION TO SEE WHAT HER, IF THEY RAN INTO THE SAME THING AND HOW THEY WORKED THAT MISSION.
SO HAS THIS BEEN AN ISSUE BEFORE WE'VE HAD THIS MUCH OF A.
FACTOR. THIS IS PRETTY DRAMATIC.
YOU'VE ONLY BEEN HERE LIKE THREE MONTHS, SO YOU'RE NOT GOING TO KNOW.
WOW, DURING THE TIME I'VE BEEN HERE.
I'VE NEVER HEARD OF ANYTHING THIS DRASTIC AS FAR AS THIS REPLACING ENTIRE DRIVEWAYS ON A . WELL AND DUE TO THE COST OR THE GRADES OR THE IMPACTS.
I MEAN, IT MAY BE IT MAY BE A SITUATION WHERE THE ANSWER IS NO, WE WOULDN'T BUILD SIDEWALKS AT THIS LOCATION.
YEAH. THERE'S ALSO A POSSIBILITY THAT DUE TO THE GRADES, MAY NOT BE ABLE TO MAKE THE ENGINEERING WORK. I MEAN, YOU CAN MAKE THE I MEAN, WHEN YOU WHEN YOU FLATTEN OUT THE SIDEWALK AND YOU MAKE IT THE DRIVEWAY STEEPER.
CORVETTE OR, YOU KNOW, A LOW CAR WOULD SCRATCH.
I MEAN, IT WOULD BE HARD TO TO GET UP THOSE DRIVEWAYS.
[00:45:02]
FASCINATING. WHAT COULD YOU NOT SPECIFY IN THE POLICY OF SOMETHING ABOUT GRADE TO MAKE IT KNOWN THAT, WELL, IF YOUR HOUSE IS THIS GRADE, THE DRIVEWAY NOT GOING TO HAPPEN, YOU KNOW, IS THERE? DO YOU SEE LIKE I'M TRYING TO THINK OF WAYS TO.KEEP THIS SORT OF SITUATION, BECAUSE THIS IS THIS COULD BE PRETTY EXPENSIVE TO DO ALL THOSE DRIVEWAYS OVER.
IN OUR INITIAL DISCUSSION WITH THE DESIGN ENGINEER, THEY HAD SAID, WELL, WE MAY HAVE TO ACTUALLY GO OUT AND DO SOME TAKE SOME SURVEY SHOTS TO SEE IF IT'S EVEN POSSIBLE BECAUSE IF THE DRIVEWAYS GET TO BE 18 TO 20 PERCENT, THAT'S NOT REASONABLE FOR THE PROPERTY OWNER EITHER. BUT COULD THAT BE IN THE POLICY LIKE IF THE GRADE IS OVER 18 PERCENT? NO CAN DO. WE CAN DO THAT.
INSTALLATION OF THE SIDEWALK INCREASES THE GRADE OF THE DRIVEWAYS MORE THAN A CERTAIN PERCENT, THEN IT WILL NOT BE CONSIDERED OR IT WILL NOT BE CONSIDERED.
WE CAN COME UP WITH THAT POLICY ON THAT.
SO ALL YOU'RE ASKING US TO DO TONIGHT IS JUST APPROVE THE POLICY, THE PROTOCOLS FOR ADDRESSING PUBLIC REQUESTS FOR ADDITIONAL SIDEWALKS.
THAT'S ALL WE'RE DOING TONIGHT.
SO WHETHER WE LIKE THIS PROCEDURE OR NOT.
ALL RIGHT, I'LL MAKE A MOTION TO APPROVE THE POLICY IS WRITTEN.
I'LL SECOND. WELL, ARE WE GOING TO GET THAT CHANGE IN THE GRADE? WE CAN DO THAT. BUT I WONDER IF THAT COMES AFTER IT'S BASED ON THE EVALUATION.
YOU DETERMINE WHETHER THIS IS JUST A POLICY OF HOW YOU MAKE THE REQUEST.
AND THEN THERE'S SOME DETAIL IN IT ABOUT HERE'S THE CONDITIONS.
BUT ONCE YOU GO AND EVALUATE, IT IS WHEN YOU WOULD GO BACK AND SAY, I'M JUST THINKING OUT LOUD, THAT'S WHEN YOU GO BACK AND SAY, IT'S THIS IS PROHIBITIVE FOR US TO DO THIS.
YOU CAN'T MAKE THE COMPLIANCE IF WE WORK HERE, RIGHT? IF WE BRING THAT BACK TO THE BOARD AND IT'S NOT ABLE TO MEET THAT MAXIMUM GRADE, THEN THAT GIVES YOU ALL THE ABILITY TO DENY THE REQUEST.
BUT THAT DOESN'T NECESSARILY HAVE TO BE IN THIS REQUEST POLICY.
IT DOESN'T HAVE TO BE. I MEAN, IT DOESN'T HURT FOR IT TO BE IN IT, EITHER.
THIS IS HOW YOU MAKE THE REQUEST.
RIGHT NOW IT'S HOW YOU MAKE THE REQUEST CORRECT.
ALL RIGHT. WE HAVE THE MOTION WAITING ON THE SECOND.
MOTION SECONDED. ALL THOSE IN FAVOR SAY AYE.
AYE. OPPOSED, NAY? ONE NAY. THE MOTION CARRIES.
ANY FUTURE BUSINESS OR ADDITIONAL DISCUSSIONS FOR THE BOARD? DO I HAVE A MOTION TO ADJOURN THE MEETING? I WOULD LOVE TO MAKE A MOTION TO ADJOURN.
OKAY. AND DO WE HAVE A SECOND? I'LL SECOND.
MOTION SECOND. ALL THOSE IN FAVOR, SAY AYE.
AYE. THE MEETING IS ADJOURNED AT 6:53 P.M.